Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Metal Mobilization in Hydrothermal Sediments
By Sofia Martins, Anna Lichtschlag, Sven Petersen, Fernando Barriga, Bramley Murton, Adeline Dutrieux
"Sediments in the vicinity of the hydrothermal seafloor massive sulphide (SMS) mounds are characterized by high concentration of metallic particles. They result from a long process of weathering of th
Jan 1, 2017
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat
By Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
Goldcorp’s Penasquito Pyrite Leach Project
Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit
Jan 1, 2017
-
Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine
By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby
"Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe
Jan 1, 2017
-
Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology
By Steni Stefani, Sanjay Dave
"This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th
Jan 1, 2017
-
Linking Flotation Efficiency to Bubble Size
By Jose R. Hernandez-Aguilar
"This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and pulp-zone bubble size (Db) in full-scale flotation s
Jan 1, 2017
-
Securing Rail Infrastructure in Romania
By Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Managing SOE Construction Risk through Design-Build Systems
By Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Flash Flotation Circuit Design Considerations
"The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa
Jan 1, 2017
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall
By Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Spiral Surface Property Investigation
By X. Louw
"This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do
Jan 1, 2017
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan
By J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
Technical Review and Evaluation of Ore Sorting Technology Incorporating Results from Four Properties
By B. Hilscher, P. Nayak, N. Yoon
"The mining industry is currently facing challenges with declining feed grades and is struggling to find solutions to improve the project’s economic value. By means of pre-concentration, ore sorting a
Jan 1, 2017
-
A New Method for the Stabilization of Arsenic from Enargite Concentrates
By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel
"As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.
Jan 1, 2017
-
RD Pile Wall – A Water Tight Retaining Wall Structure
By Antti J. Perala, Teemu J. Yli-Kovero
"Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction
Jan 1, 2017
-
The Need to Innovate: Celebrate the Past....Look to the Future
By Dominic Fragomeni
"The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min
Jan 1, 2017
-
Soil Improvement Using Soil Mixing – An Alternative Way for the Indian Market
By Franz-Werner Gerressen
"The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i
Jan 1, 2017
-
Assessing the Total Cost of Representativity in Flotation Plants
By D. Brand
"The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus
Jan 1, 2017
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study
By M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size
By Dave Rose, Jacques McMullen
"The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul
Jan 1, 2017