Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for Displacement

    By D. Fenn, A. du Kanda, D. Dukhan

    "SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen

    Jan 1, 2015

  • DFI
    Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of Canada

    By Richard Deakin

    This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and

    Jan 1, 2011

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • SAIMM
    Determining the value of additional drilling

    The spatial distribution of copper grades at the Mansa Mina project is highly variable due to the presence of high grade copper/silver/arsenic breccia bodies. Copper grades within the breccia bodies t

    Jan 1, 2003

  • DFI
    Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in Bangladesh

    By Arpit Parikh

    "Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro

    Jan 1, 2017

  • SME
    Deterministic And Stochastic Water Balance Modeling Of The Gilt Edge Mine Superfund Site, South Dakota

    By K. Wangerud, B. S. Caruso

    A water balance model with deterministic and stochastic components was developed and used for the Gilt Edge Mine Superfund Site, South Dakota, to evaluate risks of contaminated runoff discharging to s

    Jan 1, 2002

  • AUSIMM
    Deterministic Expert Systems : A New Planning Tool for Project Development

    Project developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv

    Jan 1, 1989

  • NIOSH
    Detrimental Effects Of Capacitance On High-Resistance-Grounded Mine Distribution Systems

    By Thomas Novak, Jeffrey L. Kohler, Joseph Sottile, Steve J. Gnapragasam

    Modern underground coal mines can be very large, having a total connected load in excess of l5 000 hp. These mines generally have many miles of high-power conveyor belts and 15 or more miles of high-v

  • AUSIMM
    Detrital Gold in North Westland

    Detrital gold in the Greymouth-Hokitika area has been won from: (a) gravel of the Pliocene Old Man Group, (b) glacial outwash gravel of Middle and Late Quaternary age, (c) raised shoreline deposits of

    Jan 1, 1996

  • SME
    Detroit Salt Mine – Past and Future

    By E. Z. Manos

    The Detroit salt mine is operated by the Detroit Salt Co. It is one of the oldest underground room-and-pillar mines in the United States still in production. Mining at the Detroit salt mine began

    Jan 1, 2003

  • SAIMM
    Developing a Mining Plan for Restarting the Operation at Uis Mine

    By J. H. Maritz, Uludag. S.

    "*Paper written on project work carried out in partial fulfilment of B.Eng(Mining Engineering) degreeAfriTin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing

    Jul 1, 2019

  • SME
    Developing a Virtual Reality Environment for Mining Research Mining, Metallurgy and Exploration (SPRINGER)

    By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jason Navoyski, Jennica L. Bellanca, William J. Helfrich

    Recent advances in computing, rendering, and display technologies have generated increased accessibility for virtual reality (VR). VR allows the creation of dynamic, high-fidelity environments to simu

  • AUSIMM
    Developing a Water Accounting Framework for the Australian Minerals Industry

    By K Ringwood, J Cummings, C J. Moran

    The development of a water accounting framework that enables consistent and contextual reporting of minerals operationsÆ water use, represents a key sustainable development objective that many Austral

    Jan 1, 2009

  • SME
    Developing an Automated Drill Hole Data Base and Analysis System

    By Steve Wiig

    In 1987, the Rock Springs, WY district office of the US Bureau of Land Management (BLM) began to develop an automated system to store, maintain and manipulate more than 14,000 drill hole logs containe

    Jan 1, 1992

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • SAIMM
    Developing Green Energy Projects in Southern Africa?A Mining Investment Approach

    By M. Seeger

    The demographics and the growing numbers of people provide a strong signal that the demand for electrical power in Southern Africa will grow considerably over the foreseeable future. Without a steady

    Jan 1, 2010

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • SME
    Developing Trees Tolerant to Degraded Mine Soils in an Underground Greenhouse Mining, Metallurgy and Exploration

    By Michael Kukay, Paul Conrad, Cosmas Opoku-Ware

    This project is exploring the potential for developing trees tolerable to degraded un-reclaimed mine site soils and tailings as a solution to re-establishing long-term tree growth on those sites. The

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004