Search Documents

Search Again

Search Again

Sort by

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • CIM
    Design of paste tailings disposal systems

    By Fred W. Brackebusch

    "The use of paste technology for surface tailings disposal may offer economic, technical, safety, and environmental advantages for both underground and surface mining operations. Paste is a non-Newton

    Jan 1, 2002

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004