Search Documents

Search Again

Search Again

Sort by

  • SME
    Design and Startup of Cortez Gold Mine’s Pipeline Mill

    By Randy N. Powell

    The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas

    Jan 1, 1999

  • SAIMM
    Design And Support Of Rockpasses At Ultra-Deep Levels

    By F. M. C. C. Vieira

    The DEEPMINE Research Programme sought to develop the technology and competence to mine gold safely and profitably at depths of 3 to 5 km. Among the many issues addressed was the stability and support

    Jan 1, 2005

  • CIM
    Design and wear of SAG mill shell liners at Brunswick mine

    By C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski

    "An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea

    Jan 1, 2005

  • SME
    Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer Settler

    By B. Gigas, M. Preston, M. Giralico

    Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability

    Jan 1, 2004

  • SME
    Design Considerations And Evaluation Process For A New Tunnel And Ocean Outfall Project

    By Steve Dubnewych

    The Joint Water Pollution Control Plant, operated by the Sanitation Districts of Los Angeles County, treats wastewater generated by over three million people. A new tunnel and ocean outfall is being c

  • SME
    Design Considerations For Structures To Be Built On Subsidence Prone Land

    By R. D. Begley

    This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid

    Jan 1, 1986

  • NIOSH
    Design Considerations For The Next Generation Of Longwall Shields

    By Thomas M. Barczak

    Advancements in support technology have occurred to a large extent because of the demands of the mine operators. Shield supports are no exception. The most notable changes in shield technology in the

  • SME
    Design Considerations For The Use Of Slurry Walls As Permanent Walls For Deep Rectangular Shaft Structures In Seismic Areas?Silicon Valley Rapid Transit Project

    By Michael J. Lehnen

    Slurry diaphragm walls are commonly used as both temporary excavation support walls, and permanent structural walls, for circular shafts and long rectangular structures (such as underground subway sta

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • NIOSH
    Design Methodology For Standing Secondary Roof Support Systems

    By Thomas P. Mucho, Thomas M. Barczak, Dennis R. Dolinar

    Maintaining ground stability in the gate roads, particularly the tailgate, has always been critical to the success of longwall mining, both in terms of safety and productivity. Several new support te

    Jan 10, 2000

  • IOM3
    Design methods to control violent pillar failures in room-and-pillar mines

    By R. K. Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard for miners and mine operators. This type of failure, termed a cascading pillar failure, occurs when one pill

    Jun 19, 1905

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • CIM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultrafine Sulphide Concentrate

    By G. Deschênes

    The Eleonore property (James Bay district of Northern Québec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Jan 1, 2013

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • DFI
    Design Of Augered Cast In Place (ACIP) Piles - Introduction

    By Michael McVay

    The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven

    Jan 1, 1997

  • DFI
    Design Of Axially Loaded Compression Piles According To Eurocode 7

    By Bauduin C. Besix

    The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load

    Jan 1, 2002

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • ISEE
    Design of Large-Scale Choked Destress Blasts in Mine Pillars Using the Empirical Destressability Index Methodology

    By Richard Brummer, John Hadjigeorgiou, Patrick Andrieux

    Some of the major challenges associated with underground mining at depth and/or under high extraction ratios are related to the resulting high stress levels, which can lead to the failure and collapse

    Jan 1, 2012

  • IOM3
    Design of longwall face support by use of neural network models

    By Jinsheng Chen, S. S. Peng

    The relationship between support performance parameters and parameters representative of mining and roof conditions is characterised by uncertainty, non-linearity and dependence, so the theory of arti

    Jun 21, 1905

  • SAIMM
    Design of Merensky Reef Crush Pillars

    By B. P. Watson

    The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl

    Jan 1, 2010