Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling OperationBy Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin
"In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14
Jan 1, 2011
-
Updating the NIOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP),Version 1.0, was released at the 19th Ground Control Conference. This original program has since been updated to Version 2.3 which was releas
-
Upgrade Of Multi-Phase Separation Vessels Utilising Cold Weld Polymer TechnologyBy David J. Blackwell
The challenge; to design production facilities and in particular separation equipment which have the ability to deal effectively with the ever changing composition of well fluids, over the life time o
Jan 1, 2006
-
Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - WBy Yi Luo
In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a
Jan 1, 2008
-
Upgrading an Australian Iron Ore by Reduction and Efficient Magnetic SeparationBy S M. Zhang, Y X. Han, J Liu, Y J. Li
"Compared with conventional roasting and magnetic separation processes, higher reduction temperatures and stronger reducing atmospheres are used in reduction technologies to reduce iron oxides to meta
Aug 12, 2013
-
Upgrading Gasifier Slag – Preprint 97-69By M. S. Klima, V. Choudhry
Coal gasification solid residue (slag) contains unconverted carbon (char) which is considered an impurity for utilization applications of slag. Under this study, table concentration was used to proces
Feb 24, 1997
-
Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143By N. Merriam
This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo
Feb 24, 1997
-
Upgrading of a Flow Sheet Selection PC Algorithm for Refractory Concentrates TreatmentUpgrading of a Flow Sheet Selection PC Algorithm for Refractory Concentrates Treatment
Sep 13, 2010
-
Upgrading of aluminum dross by selective comminution and sizingBy K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri
"Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe
Jan 1, 1987
-
Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)By Misra V. N, Cheng C. Y
Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i
Jan 1, 1999
-
Upgrading of Phosphate Fines by Fatty Acid Flotation Using Amylase Enzyme as a Surface Modifier (Mining, Metallurgy & Exploration) (8827c093-1c5b-4a9c-b3fd-b59e256d9af5)By K. E. Yassin, A. Yehia, M. Amar
Phosphate fines (size ≤ 45 μm), from the Red Sea Region, Egypt, were subjected to beneficiation process to recover the phosphorite grains from such fines. The sample is characterized by low P2O5 conte
-
Upgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation ProcessUpgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation Process
Sep 13, 2010
-
Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant StructureBy Tsunenobu Nozaki
"AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr
Jan 1, 2014
-
Uplift Micropile Load Transfer In Unsaturated Missoula Flood DepositsBy John N. Cunningham
Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th
Jan 1, 2011
-
Upper Waimangaroa Northern Opencast Mine: An OverviewThe Upper Waimangaroa mining permit is part of the Buller Coalfield and lies on the eastern side of the Stockton-Denniston Plateau. The mining permit area is estimated to contain a total in-ground coa
Jan 1, 1998
-
Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 MineBy R. W. Baker
"The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s
Jan 1, 1988
-
Uranium in Tertiary Stream Channels, Lake Frome Area, South AustraliaUranium exploration over a wide area of the Southern Frame Embayment, South Australia, has defined a number of Lower Tertiary fluvial palaeochannels incised in older rocks. The buried channels contain
Jan 1, 1978
-
Uranium Milling in Northern Saskatchewan’s Athabasca Basin Past, Present and FutureBy Chuck Edwards
"Milling operations in northern Saskatchewan’s Athabasca Basin have produced uranium continuously since 1975. Over that period, the Athabasca Basin has been one of the world’s premier uranium camps, y
Jan 1, 2011
-
Uranium Mineralization at Anomaly 2J, South Alligator Valley, Northern Territory, and Its Significance Concerning Regional Structure and StratigraphyBy Miezitis Y
A weak airborne radiometric anomaly was examined in the field and the presence of uranium confirmed. Rotary-percussion drilling showed the presence of uranium but a subsequent programme of diamond and
Jan 1, 1977
-
Uranium-Molybdenum Mineralization at Ben Lomond, Hervey Range, North Queensland, AustraliaBy Cocquio D. S, Bauchau C
In the course of an integrated airborne survey in 1975, a uranium-molybdenum deposit was discovered by Minatome Australia Pty Limited in North Queensland, Australia, approximately 70 km by road west o
Jan 1, 1980