Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Simulation of Correlated Assay Variables - A Case Study from the Yandi Channel Iron Deposit

    By C De-Vitry

    "The large Yandi channel iron deposit (CID) is located in the north-west of Western Australia and is currently mined via open pit methods. Drilling at Yandi is widely spaced and current estimates are

    Aug 12, 2013

  • SAIMM
    Simulation of integrated underground mining-processing

    The paper examines the design issues associated with the integration of mineral processing within underground mining systems. It demonstrates conceptual integrated system design options appropriate to

    Jan 1, 2003

  • SME
    Simulation of Material Transport in a SAG Mill with Different Geometric Lifter and Pulp Lifter Attributes Using DEM Mining, Metallurgy and Exploration

    By Alejandro Gutiérrez, David Ahues, Paola Merino, Felipe González

    A Discrete Elements Method (DEM) study of load movement within a SAG mill 12,192 × 7620 (40′ × 25′) in normal operating conditions is performed. The purpose is to determine how the geometry of the lif

  • IOM3
    Simulation of mining conveyance dynamics

    By P. S. Heyns, M. Heyns

    A computer model has been developed of mine hoisting systems in deep South African gold mines. Particular attention was paid to the contribution of different modelling assumptions for the guides and g

    Jun 19, 1905

  • SAIMM
    Simulation of the mechanical behaviour of a fracture in shear: implication of the distribution of the void space

    By J. Riss, S. Gentier, A. Marache

    The study of the hydromechanical behaviour of fractured rock masses requires a detailed knowledge of the isolated fractures. The aim of the paper is the simulation of the evolution of the void space,

    Jan 1, 2003

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • SAIMM
    Simulation Of Time-Dependent Crush Pillar Behaviour In Tabular Platinum Mines ? Synopsis

    By J. A. L. Napier

    It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent

    Jan 1, 2012

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • ISEE
    Simulations of Platform Loading from Explosions in Saturated Sand

    By William G. Szymczak

    A set of experiments were conducted at the Aberdeen Proving Grounds [1] in which explosive charges were buried in saturated sand beneath a suspended rigid platform. The goal of these experiments was t

    Jan 1, 2005

  • SME
    Single Bore Solution For Transit Tunnels

    By Verya Nasri

    The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is

    Jan 1, 2010

  • NIOSH
    Single Borehole Mining Of Uranium Ore - Objective

    To mine uraniferous sand-stone in an economically feasible and environmentally compatible manner without placing men underground. Approach Uraniferous sand is remotely extracted through a sing

    Jan 1, 1978

  • SAIMM
    Single Level Extraction At Koffiefontein

    By R. L. Pienaar

    Paper written on project work carried out in partial fulfilment of B Eng (Min. Eng.) degree A study was conducted to investigated and compare the feasibility of two single level extraction layouts

    Jan 1, 2006

  • AUSIMM
    Single particle breakage tests: a review of principles and applications to comminution modelling

    Single particle breakage tests have been used by a number of researchers to investigate some salient features of the complex comminution process. The characteristics of the common single particle brea

    Jan 1, 1986

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • AUSIMM
    Single-Particle Combustion of Chalcopyrite

    Chalcopyrite concentrate was combusted in oxygen-nitrogen atmospheres, the composition of which ranged from 1-100 per cent oxygen. Factors studied included particle size, experimental temperature and

    Jan 1, 1983

  • SME
    Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage Prevention

    By Fritz Grübl

    Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.

    Jan 1, 2001

  • IOM3
    Sintering reactors between a complex Chinese iron ore concentrate and Australian ores

    By B. M. England, C. Y. Yang, L. T. Matthews, J. Y. Yin

    The domestic concentrate used by the Shanghai Meishan Metallurgical Corporation in Nanjing contains significant siderite, magnetite and haematite, the siderite having a substantial influence on its si

    Aug 1, 1995

  • IIMP
    Sistema de admisión de aire (Aplicación Fleetgueard)

    By Manuel Caro

    El presente trabajo describe el proceso de mantenimiento del equipo de aire denominado Optiair. Este filtro al tener una mayor capacidad de retención de polvo, permite que el equipo pueda trabajar po

    Aug 25, 2002

  • IIMP
    Sistema de control maestro para sopladores en paralelo

    By Richard Manrique

    "La implementación del proyecto de modernización de la fundición de cobre de Southern Peru Copper Corporation requiere cambiar la metodología de funcionamiento de los sopladores para la etapa de conve

    Sep 19, 2006

  • IIMP
    Sistema de control. Supervisor experto para el manejo de gases

    By Jorge Meza

    Uno de los objetivos principales del proyecto de la modernización de la Fundición SPCC es capturar y procesar el gas generado de la reacción exotérmica del proceso de fusión de los sulfuros del conce

    Sep 19, 2006