Search Documents

Search Again

Search Again

Sort by

  • ISEE
    Probable Causes of Explosives System Malfunction in Blasting

    By B Mohanty, G Yamin

    A number of parameters, aside from blast design and pre-existing rock conditions, can change the performance of the explosives system in actual blasting practice. Sympathetic pressures caused by deton

    Jan 1, 2005

  • SME
    Probable Cost Estimating and Risk Management

    By John Reilly

    Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti

    Jan 1, 2008

  • AIME
    Problem of Inclined Layers in Seismic Reflection Methods

    By Zdzislaw Specht

    THIS paper discusses elementary laws pertaining to seismic reflection methods and presents a general and simple criterion for determining the direction of dipping of a reflection horizon from observat

    Jan 1, 1940

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • AUSIMM
    Problems and Findings of Applied Petrology in Relation to the Upgrading of Brown Coal

    Regions with extensive reserves of brown coal but with inadequate deposits of hard coal provide a particularly suitable field for the application of brown coal petrology.In fact, this discipline is in

    Jan 1, 1968

  • SME-ICGCM
    Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines

    By V. Eu. Anufriev

    Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re

    Jan 1, 1996

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • NIOSH
    Procedures For Designing In Situ Leach Mines For Copper ? Objective

    Provide the U.S. mining industry with technology for designing environmentally sound, low-cost in situ leach mining operations to produce copper from small, deep, and/or low-grade copper oxide deposit

    Jan 1, 1989

  • SME
    Proceedings Of Elko 2009: Mine Closure And Cover Design

    By Bryan Ulrich

    Rroundtable 2009, a Knight Piésold and Co.-hosted roundtable discussion on mine closure and cover design was held at the Red Lion Inn and Casino in Elko, NV on Feb. 12, 2009. Knight Piésold?s Bryan Ul

    Jan 1, 2009

  • SAIMM
    Proceedings, 105th Annual General Meeting, 2002

    The 105th Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the J.C. Lemmer Auditorium, SA National Museum of Military History, 22Erlswold Way, Saxonwold, Joha

    Jan 1, 2002

  • SAIMM
    Proceedings, 107th Annual General Meeting, 2004

    The 107th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 11 August, 2004. Welcom

    Jan 1, 2004

  • IIMP
    Proceso Chapi, alternativa para la lixiviaciÓn de sulfuros secundarios de cobre con sal en medio ácido

    By Victor Benavente

    La lixiviación es un proceso hidrometalúrgico que permite obtener el cobre de los minerales que lo contienen, aplicando una disolución de ácido sulfúrico, agua y agentes oxidantes. Este proceso consis

    Sep 12, 2011

  • CIM
    Process Applicaiton Design of Hydrocyclones for Closed-Circuit Grinding

    "Generation and removal of fines are considered in the context of the mill and classifier as a single-unit process in which grinding rates and mechanisms, mill residence time distribution, circulating

    Jan 1, 1984

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • CIM
    Process Control... And Where Are We Going?

    By Brian Flintoff

    "When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first

    Jan 1, 1998

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • CIM
    Process design considerations for the fluidized bed technology applications in the nickel industry

    By K. Adham, C. Lee

    Over the last forty years, a number of specific fluidized bed applications in nickel extraction have been developed for commercial use. Five important processes have gained particular acceptance, name

    Jan 1, 2004

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001