    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • AUSIMM
    Long-Hole Directional Drilling Applications at Huntly West Mine, New Zealand

    By D Vickers, N C. Fowke

    The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge

    Jan 1, 1991

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • AUSIMM
    Long-Term Mine Planning at the Largest Phosphate Mine in Brazil

    Tapira Mine (Tapira, MG, Brazil) is the largest phosphate ore and concentrate producer in Brazil. The mine is an open pit, which until recently operated with a large equipment fleet and now uses a sma

    May 1, 2010

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • SME
    Long-Term Trends in Copper Prices

    By John E. Tilton

    Real copper prices during the past several decades display two striking characteristics. First, they are highly volatile. Within a year or two, copper prices can rise or fall by 30% or more. Second

    Jan 1, 2002

  • DFI
    Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? Synopsis

    By B. B. Broms

    The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method

    Jan 1, 2010

  • SME
    Longwall Coal Mining Under S.M.C.R.A. 1977 The Ohio Experience

    By Robert J. Rothwell

    Underground mining of coal by longwall mining methods has not been a predominant technique in Ohio. To date, only five mines in the state utilize this method, however, the technique has sparked a cert

    Jan 1, 1986

  • AUSIMM
    Longwall Mining at Huntly West

    By W Farnworth

    The Huntly West Mine has undergone significant changes in the last two years, which will affect the remainder of the mine's life. The paper describes the evolvement of plans and an overview of th

    Jan 1, 1991

  • SME
    Longwall Mining, Shale Gas Production, and Underground Miner Safety and Health

    This paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac

    Jan 7, 2020

  • SME
    Longwall Pillar Design --Some Recent Developments

    Effective ground control in the gate entries, particularly in the tailgate travelways, is essential for safe longwall mining. Longwall pillars maintain gate entry stability and carry abutment loads. T

    Jan 1, 1989

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • SME-ICGCM
    Longwall Support Monitoring

    By Robert G. Harris

    During the last five years there have been significant improvements in face support monitoring techniques particularly in respect of face pressure. The measurement of support loading pressures was

    Jan 1, 1993

  • SME
    Longwall-Induced Ground Movement at a Shale Gas Well Site Located in a District Barrier Pillar—FLAC3D Modeling Results and Interpretation

    This paper evaluates the effect of longwall mining on a cluster of unconventional shale gas wells located in a district barrier pillar between a current longwall panel and the future panel north of th

    Jan 7, 2020

  • SAIMM
    Longwalling At Great Depth In A Geologically Disturbed Environment - The Way Forward

    By F. Russo-Bello

    TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below

    Jan 1, 2000

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SME
    Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, Slovakia

    By Chikaosa Tanimoto

    INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con