Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
In-situ modification of platinum-group minerals in Tonsina ultramafic complex, south-central Alaska: implications for surficial dispersion and geochemical explorationBy N. B. J. Kieser
Paper presented at the IAGOD international symposium on mineralization related to mafic and ultramafic rocks, held in Orleans, France, 1-3 September 1993. Platinum-group minerals (PGM) in the enriched
Apr 1, 1994
-
In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United KingdomBy Paul N. Freeman
This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe
Jan 1, 1992
-
In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons LearnedBy François G. Bernardeau
Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement
Jan 1, 2008
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs (d7c8f4cb-6d76-4845-93df-11dd74a1d904)By Sean Harvey
One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall
Jan 1, 2009
-
In-track assessment of premium and intermediate grade rail steelsBy K. J. Griffin, G. W. Rosval
"In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi
Jan 1, 1988
-
Inception and Evolution of Cenozoic Arc-Type Volcanism in Northern New ZealandBy P M. Black, T Itaya
Arc-type volcanic activity has been a major feature of the late Cenozoic geological evolution of the Pacific-Australian plate boundary in the northernNew Zealand region. The time/space distribution pa
Jan 1, 1995
-
Incline Caving As A Massive Mining MethodBy D. D. Munro
Finsch Mine is a kimberlite diamond mine located at Lime Acres in the Northern Cape Province of South Africa. The mine was founded in 1961 and started surface mining in 1964. Underground production co
Jul 1, 2013
-
Including In-Process Inventories in the Metal Accounting of Flotation Plants"Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br
Jan 1, 2014
-
Inclusions-Their Effect, Solubility and Control in Cast SteelBy C. E. Sims
THE following presentation is more a summation of observations made and conclusions drawn over a period of three to four years than a report of experiments made with a definite objective. Tests were m
Jan 1, 1932
-
Incorporating Indigenous Technologies Into Enhanced Stormwater, Erosion And Sediment Control SystemsBy R. C. Warner, L. Mills, S. D. Botts, M. Marticorena
The Antamina Mine is located in the mountainous region of the Ancash Department of Peru at an elevation of approximately 4200m.The 120 km main access road crosses the headwaters of numerous high-value
Jan 1, 2004
-
Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy SoilsBy Luo Yang
It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid
Jan 1, 2006
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design ProcessBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Increased Carbon Dioxide Absorption Rates In Carbonate Solutions By Surfactant AdditionBy B. P. Spigarelli
To meet the growing need for CO2 capture and storage technology, Michigan Technological University is researching CO2 capture and storage using carbonate solutions. The objective of the present study
Feb 27, 2013
-
Increased Rolling Mill Capacity at Kwinana and NewcastleThe large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa
Jan 1, 1957
-
Increased TBM Mobility and Adaptations for Special ProjectsBy Dennis Ofiara
Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin
Jan 1, 2008
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery SystemThe recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
Increasing Face Ventilation in Coal MinesThe author summarizes and extends the relevant results of papers previously published by various authors and presents these results in chart form. The charts are used to demonstrate the theory on a hy
Jan 1, 1958
-
Increasing Grinding Circuit Robustness with Advanced Process ControlBy A Rantala, K Aberkrom, O Haavisto, P Blanz
More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits
Sep 7, 2015