Search Documents

Search Again

Search Again

Sort by

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • ISEE
    Improvements in Quarry Blasting Cost Effectiveness

    By P Cotton, N Cox

    The Brisbane City Council has implemented a program of continual improvement at its Mount Coottha Quarry in the heart of Brisbane, Australia. The program has been underway for the past 6 years, and ha

    Jan 1, 1996

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited

    By Holly J

    The period following World War II has seen many changes in stoping techniques at The Great Boulder Gold Mine. The new methods resulted in improved unit production figures, and have given some relief f

    Jan 1, 1956

  • AUSIMM
    Improvements in the InLine Pressure Jig Expands its Applications and Ease of Use for Gold, Silver, Sulfide and Diamond Recovery

    By T Hughes

    The Gekko InLine Pressure Jig (IPJ) was unleashed on the World gravity separation market in 1996 and has since sold over 150 units in applications including tin, diamonds, silver, coal, garnet and gol

    Jan 1, 2008

  • SME
    Improvements On Blasting Technique For Headrace Tunnels

    By Yoneji Kanoh, Masahiko Ohtsuka

    In Japanese tunneling history, it has commonly been accepted that the long-round driving is difficult due to the complicated geological condition. Therefore, the maximum past record has been less than

    Jan 1, 1983

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • AUSIMM
    Improving calibration of flow models against SLC marker trials by linking blasting effects to particle mobility

    By A D. Campbell, G R. Power

    Many caving mines use numerical flow models to simulate mine production, forecast recovered ore grades and optimise the draw strategy. In sublevel caving (SLC) mines, the effects of blasting and fragm

    Oct 16, 2017

  • SAIMM
    Improving Cfd Analysis Of Dc Furnace Operation By Refining And Addition Of Transportation Phenomena Models

    By M. Shapiro, L. A. le Grange, B. Henning

    A paper was presented by Bateman Minerals and Metals at INFACONX (2004) describing a simplified Computational Fluid Dynamics (CFD) Model for predicting the temperature and velocity distributions in al

    Jan 1, 2007

  • SME
    Improving Coarse Particle Flotation For Energy Savings

    By H. Do, R. Yoon

    Mineral flotation is effective over a relatively narrow particle size range of approximately 10 to 100 µm. If the upper particle size limit can be increased, however, a run-of-mine ore may be coarse g

    Jan 1, 2007

  • CIM
    Improving Column Flotation Cell Operation in a Copper/Molybdenum Separation Circuit

    By Jose R. Hernandez-Aguilar, Jeet Basi

    "The study evaluated the impact on overall circuit metallurgy of improving the performance of the two flotation columns that make up the final Mo cleaning stage in the Cu/Mo separation circuit at High

    Jan 1, 2009

  • CIM
    Improving Concentrate Grade through Smart Design and Piloting

    By T. Strong

    "Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo

    Jan 1, 2017

  • SME-ICGCM
    Improving Design Methodology For Innovative Rock Mechanics Design

    By Dwayne C. Kicker

    This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a

    Jan 1, 1989

  • CIM
    Improving Double Bench Face Performance at the Ekati Diamond MineTM Site

    By Judy K. Todd

    Double benching has been utilized as an excavation technique in open pit mines for many years. This process involves drilling, blasting, and excavating the material for the design bench height. A seco

    May 1, 2002

  • SME
    Improving Energy Efficiency in Copper Heap Leaching with the use of Binders

    By K. A. Lewandowski

    Leach heaps are plagued with problems due to fine material migrating downwards, clogging the spaces between the coarser ore particles, resulting in decreased metal recovery rates. The use of a binder

    Jan 1, 2008

  • SAIMM
    Improving Financial Returns From Mining Through Geostatistical Simulation And The Optimized Advance Drilling Grid At El Tesoro Copper Mine ? Synopsis

    By J. M. Ortiz

    Grade control and short-term planning are usually based on the samples obtained from blastholes. These samples may carry a large sampling and sample preparation error. At El Tesoro copper mine in nort

    Jan 1, 2012

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • CIM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™

    By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown

    "Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r

    Jan 1, 2001

  • ISEE
    Improving Fragmentation During Ring-Hole Blasting in Coal in Blasting Gallery Panels

    By Sri Sawmliana, P. Pal Roy

    Blasting Gallery (BG) method was introduced in India for higher production and low cost of excavation to substitute conventional hand section and stowing methods for thick coal seam. The Singareni Col

    Jan 1, 2003

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen

  • SME
    Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite Ores

    By J. M. Ekenes

    New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser

    Jan 1, 2012