Rich Hill, Arizona: Historic Gold District, Modern Gold RushBy Erik Melchiorre, M. Katherine Crombie, Dante Lauretta, Chris Gholson
Rich Hill, also known as Weaver District No. 2, is among the most productive placer gold locations in Arizona. Located near Congress, AZ (Fig. 1), this district hosted major placer rushes in the 1860
Jan 1, 2003
-
Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground DepositBy C. Deutsch
Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells
Jan 1, 2007
-
Surface ExtractionBy Christopher J. Bise
INTRODUCTION The level of analysis for the selection of extraction practices and equipment for surface mining differs significantly from that found in underground mining. In underground mines, manuf
Jan 1, 1986
-
Final Tunnel Liner At The Mill Creek 3 ProjectBy M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and ExplorationBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration (7cabb148-285f-4ad0-9583-a6d360323de4)By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)By M. L. Harris
In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo
Jan 1, 2008
-
Tunnel Boring at Stillwater’s East Boulder ProjectBy Clayr Alexander
Stillwater Mining Co. (SMC) is engaged in developing, extracting, processing and refining palladium, platinum and associated metals (PGM)from the J-M Reef. This geological formation is located in Sti
Jan 1, 1999
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162By C. Treworgy, C. Chenoworth
Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois
Feb 24, 1997
-
Multiple Seam Mining In Appalachia State-Of-The-Art, State-Of-Practice, State-Of-The FutureBy D. Newman
Multiple seam mining is prevalent in Southern Appalachia because economically mineable coal seams are numerous and frequently occur in close vertical proximity. West Virginia, Kentucky, and Virginia
Jan 1, 2007
-
An Approach To Successful Development Of International Mineral ProjectsBy T. L. Owen
Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o
Jan 1, 2000
-
Scaleup Experience In Gold-Silver Heap LeachingBy Daniel W. Kappes
Testing ores for heap leach operations traditionally follows a progression of bottle roll tests, bucket and column leach tests, and very expensive large field leach tests. Enough data is now available
Jan 1, 1981
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
Applicable Analytical Tools For A Seismic Design Of Underground ExcavationsBy Christopher M. St. John, Tony F. Zahrah
Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu
Jan 1, 1985
-
Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving DataBy Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami
For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve
Jan 1, 2007
-
Will In-Place Recovery Ever Replace the Need for Flotation? Mining, Metallurgy and ExplorationBy Robin J. Batterham, Dave J. Robinson
The history of mineral processing in general and flotation in particular is long and has always been tied to mining methods of the day. Building on the ever-improving fundamental understanding of the
-
Challenges In CFD Modeling Of Air Flow In Open-Pit MinesBy K. V. Raj
In the mining industry, computational fluid dynamics (CFD) modeling is used extensively to simulate air flow in underground mines. CFD modeling of pollutant transport in open-pit mines is relatively n
Feb 27, 2013
-
Experiences And Projections On Sag Mill Multivariable Predictive ControlBy R. Fuenzalida
Since 2007, a number of Multivariable Predictive Control (MPC) Applications have been implemented on SAG mills, among others, within the Kairos Mining Concentrator Automation Program using ?Profit Con
Jan 1, 2012
-
Observational Method Using Real Time Surface Settlement Monitoring On The South Toulon Tunnel Project - Introduction - Project HistoryBy B. C. Vargas
The Toulon tunnel project is a key component of the Highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig
Jan 1, 2012