Search Documents

  • IOM3
    Catalytic effects in CaO-enhanced reduction of copper sulphide: Cu2S-CaO-C system

    By M. Moinpour, Y. K. Rao

    The catalysed direct reduction of copper sulphide with carbon and lime was investigated in the range 850-1000 degrees C using Cu2S-CaO-C and Cu2S-4CaO-4C reaction mixtures. The effects of the catalyti

    Jul 1, 1991

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • SME
    The Current State of Disc Cutter Design and Development Directions

    By Joe Roby

    Rolling disc cutters are the business end of hard rock and mixed face tunnel boring machines (TBMs). Since their first successful employment on a TBM over fifty years ago, disc cutter technology has c

    Jan 1, 2008

  • TMS
    A Thermochemical Study Of Different Options For Halogen Removal From Nonferrous Metal-Containing Wastes

    By J. Antrekowitsch

    Keywords: residues, fluorides, chlorides, zinc, steel mill dust The recyclability of various nonferrous metal wastes often suffers from a relatively high fluorine and chlorine content. Both are ins

    Jan 1, 2005

  • SME
    Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions

    By Ergin Arioglu, Werner Burger

    "SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp

    Jan 1, 2016

  • METSOC
    Challenges Facing Nickel And Base Metal Industries

    By A. D. Dalvi

    With the current economic situation, the demand for nickel and other base metals has fallen significantly. More than 440 kt/yr world nickel capacity has been taken out of production within the last ye

    Jan 1, 2009

  • SME
    New Boomheading Machines (Roadheaders) Technical & Economic Integration Into Mine Development And Production

    By Howard J. Handewith

    Long used in mine development in England, Europe and Russia, roadheaders are growing in size, features, productivity and application. Beginning with the basics, this paper covers the economic and t

    Jan 1, 1983

  • NIOSH
    RI 9576 - Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead, SD (In Three Parts)

    By M. E. Poad, M. M. McDonald, J. C. Johnson, W. G. Pariseau

    A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near the Ross shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating

    Jan 1, 1995

  • NIOSH
    OFR-44-86 Research Study On Pillar Design For Vertical Crater Retreat (VCR) Mining

    By William G. Pariseau

    The research reported here concerns a four year study of the rock mechanics aspects of two underground hardrock mine study stopes. The first study was conducted at Anaconda Minerals Company's Car

    Jan 1, 1985

  • SAIMM
    Laboratory scale modelling of an ilmenite roaster

    By J. A. Beukes, M. Marais

    TICOR South Africa is a new titanium feed stock producer. In the Ticor South Africa plant the ilmenite feed to the smelter plant is roasted to enhance its magnetic properties. This allows for the magn

    Jan 1, 2003

  • SAIMM
    The Fabric Of Coal-Mine Refuse As Backfilling Material And Its Relation To Grain-Size Distribution Parameters

    By M. G. Senyur

    This study aims at investigating the structural characteristics of backfilling material. In this regard, spatial arrangement of solid particles and associated voids in a unit mass of coal mine refuse

    Jan 1, 1998

  • IOM3
    Mine backfilling to limit surface subsidence: a case history

    By P. H. Carr, G. G. Marino, K. A. Patel

    Extensions to a correctional institution at Wabash Valley, Indiana, required development over abandoned coal-mine workings, at 90 m depth, where subsidence was possible at surface. Backfilling of the

    Jun 19, 1905

  • AUSIMM
    Validation of the JKMRC Rotary Breakage Tester (JKRBT) Ore Breakage Characterisation Device

    Validation of the JKMRC Rotary Breakage Tester (JKRBT) Ore Breakage Characterisation Device

    Sep 13, 2010

  • SAIMM
    Isasmelt Technology - Current Status And Future Development

    By W. J. Errington

    The Isasmelt process was developed at Mount Isa Mines Limited in Queensland, Australia in collaboration with CSIRO, the Australian Government research organisation. Originally developed for primary le

    Jan 1, 1997

  • NIOSH
    The Mineral Industry Of Other Central African Countries - Cameroon (6089e9db-3773-45d3-834e-8b665a9a917e)

    By Thomas O. Glover

    Cameroon continued to enjoy sustained economic growth that began with its independence in 1960. Growth in the gross domestic product (GDP) averaged 2.8% per year during the 1960's and the first h

    Jan 1, 1988

  • CIM
    The Use of a Novel Chemistry Significantly Enhances the Strip Rate of both Gold and Silver from Carbon in Strip Circuits

    By E. J. Fuller, J. C. Monette

    "Gold and silver cyanide complexes are presently desorbed from activated carbon by means of hot caustic elutions. These solutions may or may not contain additional sodium cyanide. There are several pa

    Jan 1, 1992

  • NIOSH
    OFR-76(4)-75 Mine Electrical Systems Evaluation - Mine Power System Performance - Introduction

    By Robert Stefanko

    The growing demand for energy during the post World War I and World War II periods has prompted underground coal production to increase rapidly. This has been met primarily by mine mechanization, resu

    Jan 1, 1974

  • CIM
    Vibration analysis of mining shovels

    By P. N. Saavedra, E. A. Salamanca

    "The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl

    Jan 1, 2002

  • SME
    Mine & Mill Maintenance - Corrosion Control in the Coal Industry

    By Jack A. McQuiston, Thomas A. Cross

    Corrosion of equipment and machinery in the coal industry is usually the result of three main agents: acids, chlorides, and abrasion. Acids and chlorides are especially troublesome in coal preparation

    Jan 2, 1980

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990