    Getchell Mine Pressure Oxidation Circuit Four Years After Startup

    By Dale Matthews

    The Getchell Mine, near Winnemucca, NR, was discovered in the 1930s and was initially mined to recover gold from oxide ores. During the 1940s and 1950s, gold was recovered from the highly refractory a

    Jan 1, 1994

  • AUSIMM
    Treatment of a Thallium-Cadmium Concentrate

    Thallous chloride and cadmium metal were recovered from a thallium-cadmium concentrate by a method suited to the treatment of small batches. Differences in oxide solubility and control of pH were empl

    Jan 1, 1969

  • ISEE
    Comparative Study of Blasting Techniques in Dimensional Stone Quarrying

    By Sushil Bhandari, S. S. Rathore

    Controlled drilling and blasting continue to be an important method of block production and for block splitting. Drill and blast technique has disadvantage that sometimes, it produces cracks in uncont

    Jan 1, 2002

  • SME
    Flambeau And Ridgeway Mines – Lessons Learned

    By F. D. Fox

    The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa

    Jan 1, 2003

  • NIOSH
    OFR-200-83 Floodplain Landfill With Mill Tailings

    By K. E. Robinson

    This study is the extension of an investigation of reclamation of floodplain areas in the Coeur d'Alene Mining District, Idaho, that are unuseable in their natural condition, by construction of l

    Jan 1, 1983

  • AUSIMM
    Experience in the Carbonization of Brown Coal Briquettes at Morwell

    By Kennedy G. L

    Operating experience with the pilot Lurgi carbonization plant at Morwell showed that under conventional operating conditions, although the thermal efficiency of the plant was very' high, the phys

    Jan 1, 1960

  • IOM3
    Simulation of cells with anodes of large surface area for electrolysis of alumina dissolved in a chloride melt

    Carbon anode cells were studied by two-dimensional computer simulation to evaluate their suitability for alumina electrolysis at high superficial current densities. The most efficient anode arrangemen

    Jun 19, 1905

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • SME
    Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System

    By Wolfgang Guetter, Wolfgang Weber

    The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati

    Jan 1, 2001

  • TMS
    Pressure Leaching of Enargite-Pyrite Concentrates

    By María Cristina Ruiz

    Enargite rich copper concentrates can not be treated by conventional smelting/converting technology and thus nonconventional methods such as leaching must be used. Since enargite (Cu3AsS4) is a hard t

    Jan 1, 2010

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • SAIMM
    Laboratory Study Of The Interaction Mechanisms Between Magnesia-Chromite Refractories And Al2O3-Rich VOD Slags

    By S. Parada, P. T. Jones, M. Guo, S. Smets

    The corrosion behaviour of a high-quality rebonded magnesia-chromite refractory in contact with a vacuum oxygen decarburization (VOD) slag with high Al2O3content (15?20 mass per cent) is investigated

    Jan 1, 2004

  • NIOSH
    OFR-84(5)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume V - Subsidence Subsystem

    By C. B. Manula

    This report is volume 5 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974

  • ISEE
    Is it Realistic to Always Expect Optimal Performance from Explosives?

    By Tapan Goswami

    The expectation from the blasting engineers and shotfirers is often that explosives will perform optimally at all times. However, in reality, non-ideal situations exist on mine sites and occurrences o

    Jan 1, 2003

  • AUSIMM
    Environmental and Resource Investigations for Mine Planning and Design

    Environmental information is an essential part of successful mine design and approval. In order to be most effective in its application and availability, this information needs to be collected in prog

    Jan 1, 1987

  • NIOSH
    IC 8800 Mine Power Systems Research (In Four Parts) 2. Grounding Research

    This Bureau of Mines publication contains five papers pertaining to the effective grounding of mine power systems, as follows: Ground-check monitor types and safety characteristics; ground wire monito

    Jan 1, 1979

  • AUSIMM
    A Contribution to the Study of the Molybdenite Pipes of Kingsgate, N.S.W., with Special Reference to Ore Mineralogy

    The Kingsgate molybdenite pipes are considered on petrochemical data and field occurrence to be, possibly, epi-magmatic plutonic offshoots grading into hydrothermal bodies. There is reason to believe

    Jan 1, 1962

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993

  • ISEE
    Preparing a Written Blast Plan

    By David Ziegler

    Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re