Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Getchell Mine Pressure Oxidation Circuit Four Years After StartupBy Dale Matthews
The Getchell Mine, near Winnemucca, NR, was discovered in the 1930s and was initially mined to recover gold from oxide ores. During the 1940s and 1950s, gold was recovered from the highly refractory a
Jan 1, 1994
-
Treatment of a Thallium-Cadmium ConcentrateThallous chloride and cadmium metal were recovered from a thallium-cadmium concentrate by a method suited to the treatment of small batches. Differences in oxide solubility and control of pH were empl
Jan 1, 1969
-
Comparative Study of Blasting Techniques in Dimensional Stone QuarryingBy Sushil Bhandari, S. S. Rathore
Controlled drilling and blasting continue to be an important method of block production and for block splitting. Drill and blast technique has disadvantage that sometimes, it produces cracks in uncont
Jan 1, 2002
-
Flambeau And Ridgeway Mines – Lessons LearnedBy F. D. Fox
The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa
Jan 1, 2003
-
OFR-200-83 Floodplain Landfill With Mill TailingsBy K. E. Robinson
This study is the extension of an investigation of reclamation of floodplain areas in the Coeur d'Alene Mining District, Idaho, that are unuseable in their natural condition, by construction of l
Jan 1, 1983
-
Experience in the Carbonization of Brown Coal Briquettes at MorwellBy Kennedy G. L
Operating experience with the pilot Lurgi carbonization plant at Morwell showed that under conventional operating conditions, although the thermal efficiency of the plant was very' high, the phys
Jan 1, 1960
-
Simulation of cells with anodes of large surface area for electrolysis of alumina dissolved in a chloride meltCarbon anode cells were studied by two-dimensional computer simulation to evaluate their suitability for alumina electrolysis at high superficial current densities. The most efficient anode arrangemen
Jun 19, 1905
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer ProcessBy Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining SystemBy Wolfgang Guetter, Wolfgang Weber
The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati
Jan 1, 2001
-
Pressure Leaching of Enargite-Pyrite ConcentratesBy María Cristina Ruiz
Enargite rich copper concentrates can not be treated by conventional smelting/converting technology and thus nonconventional methods such as leaching must be used. Since enargite (Cu3AsS4) is a hard t
Jan 1, 2010
-
Design and Performance of a Longwall Coal Mine Water-Barrier PillarBy Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007
-
Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation SoftwareBy Stephen Chung, Graham Mustoe, Joe Haid
In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th
Jan 1, 2006
-
Laboratory Study Of The Interaction Mechanisms Between Magnesia-Chromite Refractories And Al2O3-Rich VOD SlagsBy S. Parada, P. T. Jones, M. Guo, S. Smets
The corrosion behaviour of a high-quality rebonded magnesia-chromite refractory in contact with a vacuum oxygen decarburization (VOD) slag with high Al2O3content (15?20 mass per cent) is investigated
Jan 1, 2004
-
OFR-84(5)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume V - Subsidence SubsystemBy C. B. Manula
This report is volume 5 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod
Jan 1, 1974
-
Is it Realistic to Always Expect Optimal Performance from Explosives?By Tapan Goswami
The expectation from the blasting engineers and shotfirers is often that explosives will perform optimally at all times. However, in reality, non-ideal situations exist on mine sites and occurrences o
Jan 1, 2003
-
Environmental and Resource Investigations for Mine Planning and DesignEnvironmental information is an essential part of successful mine design and approval. In order to be most effective in its application and availability, this information needs to be collected in prog
Jan 1, 1987
-
IC 8800 Mine Power Systems Research (In Four Parts) 2. Grounding ResearchThis Bureau of Mines publication contains five papers pertaining to the effective grounding of mine power systems, as follows: Ground-check monitor types and safety characteristics; ground wire monito
Jan 1, 1979
-
A Contribution to the Study of the Molybdenite Pipes of Kingsgate, N.S.W., with Special Reference to Ore MineralogyThe Kingsgate molybdenite pipes are considered on petrochemical data and field occurrence to be, possibly, epi-magmatic plutonic offshoots grading into hydrothermal bodies. There is reason to believe
Jan 1, 1962
-
Contaminated Water Management for the Golden Cross MineBy M J. Kindley
The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula
Jan 1, 1993
-
Preparing a Written Blast PlanBy David Ziegler
Rough sketches, field notes, an on-site conference or a phone call may no longer suffice to establish your blast plan at a job site. More and more, general contractors, site supervisors, owner re p re
Jan 1, 2004