Search Documents

  • SME
    Planning and Construction of the Metro Gold Line Eastside Extension Tunnels, Los Angeles, California

    By Jim Richards, Eli Choueiry, Brett Robinson, Amanda Elioff

    The Los Angeles Metro Gold Line Eastside Extension (MGLEE) extends Metro’s light rail system to the densely populated and growing East Los Angeles communities. Much of the 6 mile alignment consists of

    Jan 1, 2007

  • SME
    Mining on the Moon and Asteroids: Yes – It’s Really Going to Happen!

    By D. A. Peacock

    "INTRODUCTION Outer space technology and exploration have reached a tipping point so that mining and mineral processing in outer space is now a certainty and not a dream. Several competing companies,

    Jan 1, 2016

  • CIM
    Low-Discharge Grinding at Sylvanite Gold Mines, Limited

    By C. E. Rodgers

    WHEN I was asked to prepare, for presentation at the 1938 Annual Meeting of the Institute, some data concerning low-discharge grinding at the Sylvanite mill, it seemed entirely reasonable to expect to

    Jan 1, 1938

  • NIOSH
    IC 8939 Passive Encoder For Range Knobs

    By William H. Schiffbauer

    The Bureau of Mines has developed a passive encoder for range knobs, a device that automates the task of obtaining the range settings from devices or instruments to be input to microcomputers. It is e

    Jan 1, 1983

  • SME
    RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case Histories

    By K. Y. Haramy, K. Hanna

    Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min

    Jan 1, 1999

  • SME
    Peru Remains Committed to Its Mining Industry

    By Steve Kral

    Despite low commodity prices and mining industry cutbacks throughout the world, Peru remains one of the industry’s bright spots. The country’s remarkable economic turnaround during the 1990s remains

    Jan 1, 2000

  • IIMP
    Gestión por procesos U- P. Uchucchacua (como base para la integracion de sistemas de gestion)

    By Daniel Briones

    El presente trabajo señala las bases que fundamentan la aplicación de los Sistemas de Gestión Integrados y se ofrecen argumentos que sustentan los mecanismos usados para integrar los sistemas de Segur

    Sep 12, 2005

  • NIOSH
    IC 8775 Spontaneous Oxidation And Combustion Of Sulfide Ores In Underground Mines - A Literature Survey

    By Donald J. Ninteman

    This Bureau of Mines publication is a literature study of the problem of spontaneous oxidation and combustion of sulfides in underground mines. It summarizes the present-day hazards, process mechanism

    Jan 1, 1978

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • CIM
    The Schaft Creek Porphyry Cu-Mo-(Au) Deposit, Northwestern British Columbia

    By J. E. Scott, L. M. Heaman, R. A. Creaser, G. S. Salazar

    "Schaft Creek is a calc-alkaline porphyry Cu-Mo-(Au) deposit located in northwestern British Columbia. The deposit formed in a volcanic arc setting, likely on a back-arc rifted continental fragment. I

    Jan 1, 2008

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • AUSIMM
    West Works-Mount Morgan Chlorination

    THE treatment by chlorination of the Mount Morgan Gold Mining Company's ores was first accomplished, early in 1886, by a works having a capacity of 25,000 tons per annum. Shortly afterwards anoth

    Jan 1, 1910

  • AUSIMM
    The Processing of a Tantalite Ore and The Preparation of The Carbides of Tantalum and Columbium

    By Greenwood J. N

    This is the fourth paper in the series on Australian w,ar materials and the work was undertaken as part of the programme for producing hard carbides. It had been intended to determine the influence of

    Jan 1, 1943

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • AUSIMM
    A Glossary of Terms Used in Mining-Geology

    When perusing articles which treat of mining geology, and when talking with miners on the field, one is at times unable to follow the exact thoughts intended to be expressed, owing to the introduction

  • AIME
    Proceedings o f the Ninetieth Meeting, Bethlehem, Pa., February, 1906

    By AIME AIME

    General Local Committee.-John Fritz, Chairman; A. B. de Saulles, Vice-Chairman.; R. M. Bird, Treasurer; Henry S. Drinker, Secretary; Robert H. Sayre, E. P. Wilbur, Charles M. Dodson, Abraham S. Schrop

    May 1, 1906

  • SAIMM
    Exploitation Of A Massive Low Grade Zinc-Lead Resource At Rosh Pinah Zinc Corporation, Namibia

    By S Rupprech, T Lund, H Fourie, PH van Rooyen, NM Vegter

    Rosh Pinah Zinc Corporation (Pty) Ltd (RPZC) operates an underground mine at Rosh Pinah in southern Namibia producing zinc and lead sulphide concentrates. It currently mines around 0.7 Mtpa run-of-min

    Jan 1, 2007

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • SME
    Pit Lake Water Quality In The Western U.S.: Unifying Concepts

    By A. Davis

    Pit lake chemistry depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock versus oxidizable sulfide content, and t

    Jan 1, 1996