Search Documents

  • AUSIMM
    An Evaluation of Background and Anomalous Copper and Zinc Concentrations in the ôCopper Plantö Polycarpaea Spirostylis and Other Australian Species of the Genus

    The copper and zinc contents of herbarium specimens of 11 of the 12 Australian species of Polycarpaea were determined in order to establish background and anomalous values of potential use in biogeoch

    Jan 1, 1978

  • AUSIMM
    Comparative evaluation of manual sampling and Outotec MSA 2/50 metallurgical slurry sampler

    By J Loimi, P Minkkinen, T Korpela

    The head loss caused by metallurgical sampling for slurry streams can be reduced by metallurgical sampler design. When the process volumetric flow rate is reduced by vertical static cutters before the

    May 9, 2017

  • SME-ICGCM
    Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern Appalachia

    By H. J. Siriwardane

    This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element

    Jan 1, 1988

  • SAIMM
    A Case Study On The Operation Of A Flottweg Tricanter® Centrifuge For Solvent-Extraction Crud Treatment At Bwana Mkubwa, Ndola, Zambia

    By Gift Chisakuta, Bravo Mbao, Nils Schwarz, Angus Feather, Anthony Mukutuma

    Bwana Mkubwa is a 50 000 tons per annum copper cathode producer, owned by First Quantum Minerals and located in Ndola, on the Zambian Copperbelt. The Bwana Mkubwa solvent-extraction circuit was starte

    Jan 1, 2007

  • SME
    Sulfur From Surface Ores

    By John M. Dale

    Now that the price of sulfur has reached unexpected high levels, it is little wonder that sulfur from surface ores is again receiving attention. In most instances, it is advantageous for an ore to be

    Jan 9, 1981

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • ISEE
    Tunnel blast drill hole surveying – Benefits and Methodologies

    By G. Adderley, A. Wetherelt

    The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-

    Jan 1, 2009

  • AUSIMM
    Industrial Mineral Production and Potential

    Industrial Minerals production in New Zealand is limited in both quantity and range, but imported in quantities that make New Zealand the world's biggest consumer per head of population. The use

    Jan 1, 1997

  • SAIMM
    Witwatersrand Gold Reef Evaluation: The ?Variancegram? Tool

    By C. Lemmer

    The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures

    Jan 1, 2014

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • ISEE
    Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground Vibrations

    By W. J. Birch, R. Farnfield

    The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa

    Jan 1, 2009

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • AUSIMM
    Mining Schools in Relation to the Mining Industry

    EARLY in 1911 the Public Service Board of New South Wales suggested the advisability of inaugurating a School of Mines at Broken Hill, arid made inquiries to determine how such an institution should b

    Jan 1, 1912

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • TMS
    Preparation Of Smco5 By Chemical Coprecipitationreduction-Diffusion Method (Cprd )

    In this study, the method of chemical co-precipitation?reduction?diffusion was developed for the preparation of magnetic SmCo5 alloy. In the chemical co-precipitation process, the effects of solution

    Jan 1, 2006

  • AUSIMM
    Utilisation of Latrobe Valley Brown Coal Fly-Ash

    By Milner A, Brockway D, Hodges S

    The combustion of brown coals in Latrobe Valley power stations produces approximately 500 000 tonnes of solid wastes each year. This material, which includes precipitator ash, char and furnace ash,

    Jan 1, 1992

  • SME
    Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line Conditions

    By J. D. Miller, C. L. Lin

    Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l

    Jan 1, 2001

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • SME
    Targeting and Prioritizing Safety Interventions in West Virginia – Preprint 97-51

    By J. M. Dean, R. L. Grayson, R. C. Althouse, M. J. Klishis, G. L. Winn

    Using powerful database management software, nested-field analysis and microanalysis of narratives have been made of West Virginia accident data, resulting in a new approach for targeting and prioriti

    Feb 24, 1997