Search Documents

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • AUSIMM
    Selective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation Method

    Selective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation Method

    Sep 13, 2010

  • DFI
    5 Pile Testing - Pile Testing

    By George Goble

    I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is

    Jan 1, 1994

  • AUSIMM
    An Example of Low Working Costs

    THE following brief paper is submitted with a view to encouraging the exploitation of hitherto neglected 10w~ grade ore-bodies which are suitable for extraction by open-cut methods.The Corinthian Nort

    Jan 1, 1915

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • NIOSH
    RI 7559 Laboratory Evaluation Of Some Factors In Cyaniding Gold Placers

    By I. L. Nichols

    The inplace cyanidation leaching of gold from placer deposits is a potential method for treating gravels too deeply buried and too low in gold content to be processed economically by conventional dred

    Jan 1, 1971

  • AUSIMM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis

    By H Kurth

    Geoscan is used for multi-elemental analysis of conveyed bulk materials in real time. It has been used for coal analysis since the 1990s, in the cement industry, and since 2003 for measuring mineral o

    Sep 7, 2015

  • NIOSH
    OFR-104(3)-80 Selective Placement Of Coal Stripmine Overburden In Montana - III. Spoil Mixing Phenomena

    By D. J. Dollhopf

    An overburden handling dragline operation was conducted at a strip mine near Colstrip, Montana. The objective of the demonstration was to determine the degree a dragline could mix overburden inhibitor

    Jan 1, 1978

  • TMS
    New Casting Moulds For Anode Copper

    By Torben Edens

    Norddeutsche Affinerie?s (NA?s) primary smelter continually increased production in the past decade. The smelter?s concentrate capacity was expanded from 500,000 in 1993 to 1,000,000 t/a dry concentra

    Jan 1, 2005

  • CIM
    An Overview of the Oil Sands Process, Comparing it to Conventional Mineral Processing

    By Gavin Ritson, Chris Ward

    "The oil sands industry is still fairly young with the first viable oil sand operation having been started in Alberta in 1960. Since then numerous modifications and improvements have been tried and im

    Jan 1, 2009

  • AUSIMM
    Flotation Plant Modelling and Simulation Using the Floatability Characterisation Test Rig (FCTR)

    Modelling and simulation are important aspects of flotation research, which may assist in the design of new circuits and the optimisation of existing ones. Flotation research in the AMIRA P9 project h

    Jan 1, 2000

  • NIOSH
    OFR-80(1)-81 Selective Interburden Handling Techniques - Volume I - Summary

    By Robert L. Lappi

    Eight interburden handling concepts are developed for multiple seam area mine stripping operations in central and western United States. They are based on data gathered and analyzed during field surve

    Jan 1, 1980

  • TMS
    Application Study on Technology of Reducing Copper Content in Discarded Slag

    By Zhi-xiang Cui

    Effects of flux, vulcanizing agent and reductant on slag cleaning in new-type slag cleaning furnace (Φ3.6 × 8.1 m) were investigated under the conditions including smelting temperature of 1200 and 125

  • SME
    Engineering Geology and Cavern Design for New York City

    By Christopher Snee

    ??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999

    Jan 1, 2008

  • SME
    Development described for fluidized bed combustion at TVA’s 20-MW pilot plant

    By James W. Bass

    Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi

    Jan 4, 1986

  • ISEE
    Compromising Technology with Field Expedience in Fragmentation Evaluation

    By Jason M. Ryan

    "Along with recent advances in computer technology have come cost-effective systems desiiedto evaluate fragmentation distributions through digital images of particles. In mining operations andmineral

    Jan 1, 1998

  • IIMP
    Trazadores litogeoquímicos de fertilidad del magmatismo vinculado a pórfidos de Cu (-Mo, -Au) en el sur del Perú, del Jurásico al Mioceno

    By Alonso Marchena, William Martínez, Joel Otero

    En Arequipa, Moquegua y Tacna se han definido diversos arcos magmáticos. En los arcos jurásico, paleoceno y oligo-mioceno ocurren pórfidos de distintas características, los cuales presentan diferencia

    May 22, 2019

  • CIM
    Environmental Law and Regulation Challenges for the Mining Industry

    By R. Cotton

    "1. INTRODUCTIONTo say that the environment will be a dominant issue in the 1990' s is an understatement. A world-wide ""green revolution"" is taking place not only with the general public and politic

    Jan 1, 1991

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005