Search Documents

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • AUSIMM
    Commissioning and Ramp-up of the Albion Process at the GPM Gold Project

    By M Hourn, D Turner, P Voigt, D Mallah

    The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced i

    Sep 7, 2015

  • AUSIMM
    The Implementation of Floatstar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits (95bc70ac-0a71-42d0-95cb-764715f2cd9c)

    By P Moswate, D Phillpotts, S M. Mantsho, P Strobos

    A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical

    Jul 15, 2013

  • SAIMM
    Co-Generation: A Challenge For Furnace Off-Gas Cleaning Systems

    By E. S. Schubert

    Keywords: co-generation, furnace CO-gas cleaning, disintegrator scrubber, Theisen In a closed, electric, reduction furnace, no oxygen enters the furnace from the surrounding environment. The off-g

    Jan 1, 2011

  • SME
    Stainless Steel For Hydrometallurgy Plants

    By J. Olsson

    Introduction Stainless steel has by tradition been a common construction material for hydrometallurgy processes and the most common grades can be found amongst the ASTM 300-series, i.e. austenitic gr

    Jan 1, 2007

  • IIMP
    Investigación y Desarrollo de Pruebas de Biolixiviación de Concentrados como alternativa de aprovechamiento de la capacidad de la Planta de Lixiviación – Extracción por Solventes y Electrodeposición – LESDE Toquepala

    By Joe Pezo

    Desde 1999 se desarrollaron pruebas de lixiviación de concentrados en la planta LESDE de Toquepala con el propósito de evaluar las recuperaciones y los tiempos de procesamiento. Las recuperaciones a n

    Sep 12, 2005

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction (328bb1d3-3996-4ea1-925a-2089360bbaba)

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963

  • SME
    Cost Effective Tunnel Development In Slovakia

    By John Chadwick

    In the drive for faster development advance rates, railbound systems can be advantageous, in the right application. Skanska BS, the contractor to mine-owner VSK Mining, is driving an adit access deep

    Jan 1, 2009

  • SME
    WROC ? An Improved Waste Rock Oxidation Code

    By S. Sunkavalli

    Acid rock drainage (ARD) is produced when sulfides are exposed to oxygen and water. Oxidation reactions typically result in a depression of pH and leaching of solutes and metals. Many oxidation models

    Feb 27, 2013

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • IIMP
    Estrategias de planeamiento de minado para maximizar el valor de la operación minera de Tintaya

    By Víctor Guimaraes

    El presente texto señala las estrategias de planteamiento de minado en la minera Tintaya con el objetivo de maximizar el valor neto de la operación minera y a un nivel aceptable de riesgo. Este ciclo

    Sep 9, 2007

  • SME
    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • SME
    CART?: A Fundamental Tool For Process Circuit Design

    By A. Noble

    The design of separation circuits can be a complex, labor-intensive and costly process. While the engineer?s experience along with extensive data sets and simulation are crucial tools for determining

    Feb 27, 2013

  • ISEE
    The Effect of Prill Specifications on Emulsion-ANFO Blends

    By Greg S. Williams, Richard W. Givens

    This paper examines the effect of prill size consistency, internal panicle density, and oil absorbency on Ammonium Nitrate Fuel Oil (ANFO)-emulsion blends. By analyzing these physical properties of pr

    Jan 1, 1992

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • SAIMM
    Changing Minds??A White Flag? ? Synopsis

    By J. L. Viljoen

    t has long been the drive of the industry and all operations to create an environment that is free of injury and illness. We have come a long way; the leaders, executives, managers, supervisors and wo

    Jan 1, 2011

  • SME
    NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th Bore

    By Bhaskar B. Thapa

    The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p

  • SME
    Grouting And Freezing For Shaft Water Control In Milwaukee

    By Patrick J. Doig

    The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a

    Jan 1, 1985

  • TMS
    The Model Of Structure Refinement In Metals At Large Deformations And Factors Effecting Grain Sizes

    By F. Z. Utyashev

    The present work considers the essence of fragmentation: on the level of a simple model as a material response to the curvature accumulated by it at large deformations. It is on this basis that the co

    Jan 1, 2006