Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Underground Measurement of Gateroad Stability at the Depth Around 1000m

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Aleksander Wrana

    "The Carboniferous coal measures, mined across Europe including the major European underground coal mining countries of Poland, UK, Germany, and Czech Republic, suffer from increasing extraction depth

    Jan 1, 2015

  • SME-ICGCM
    Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal Mines

    By Rene Rodriguez

    Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ

    Jan 1, 1994

  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    A Liquid Settlement System for Measuring Roof Sag During Development Mining - A Comparison Between Place Change Mining and a Miner?Bolter

    By Andy L. Shaffer

    A novel liquid settlement system (LSS) was installed in advance of mining at a western United States (U.S.) longwall mine to measure total roof sag from the time of cutting to days after mining during

    Jan 1, 2014

  • SME-ICGCM
    Evaluating the Risk of Coal Bursts in Underground Coal Mines

    By Michael Gauna, Christopher Mark

    "Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are almost always accompanied by a loud noise, like an explosion, and ground vibration. Bursts are a part

    Jan 1, 2015

  • SME-ICGCM
    Underground Application Of Optimization

    By S. J. Jung

    The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min

    Jan 1, 1993

  • SME-ICGCM
    Ground Control Design For Multiple Seam Mining Using Finite Element Analysis

    By John Stankus

    Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre

    Jan 1, 1999

  • SME-ICGCM
    Effect of In Situ Stresses on the Stability of Coal Mine Development Workings

    By Murali Gadde

    Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat

    Jan 1, 2004

  • SME-ICGCM
    Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad Design

    By Heather E. Lawson

    Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,

    Jan 1, 2013

  • SME-ICGCM
    Control Of Mine Subsidence Utilizing Coal Ash As A Backfill Material

    By D. W. Evans

    Mine subsidence problems due to coal extraction have occurred in a number of areas throughout the United States. Depending on the local geology, the depth of the mined seam, the type of mining method

    Jan 1, 1982

  • SME-ICGCM
    Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.

    By Styles P.

    To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est

    Jan 1, 1992

  • SME-ICGCM
    Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building

    By Gennaro G. Marino

    As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w

    Jan 1, 2013

  • SME-ICGCM
    To What Extent the Mechanical Properties of Coal Play Role in Coal Mine Bumps? A Comparison Between Bump and Non?Bump Prone Coal

    By Gamal Rashed

    Coal bump is a sudden manifestation of the release of strain energy stored in a coal pillar (Peng, 2008). It is a very serious mining hazard that adversely affects the safety and productivity of the m

    Jan 1, 2014

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014