Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock Mass

    By Samrat Mohanty

    The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage

    Jan 1, 2014

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    The Ground Response Curve, Pillar Loading and Pillar Failure in Coal Mines

    By Essie Esterhuizen, Michael M. Murphy, Chris Mark

    "The response of the surrounding rock mass to the creation of mining excavations determines the ultimate load on a pillar support system. In conditions where the ground is relatively soft and weak, th

    Jan 1, 2010

  • SME-ICGCM
    On Research Needs in Coal Mine Ground Control

    By Syd Peng

    "As the International Conference on Ground Control in Mining (ICGCM) enters its 35th year in 2015, it is time to look back and identify the areas that need to be emphasized and to look forward to see

    Jan 1, 2015

  • SME-ICGCM
    Use Of Database In Ground Control To Identify Weightings And Water Inflows

    By G. C. Xiao

    A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate

    Jan 1, 1990

  • SME-ICGCM
    International Practice in High Performance Underground Thick Coal Seam Extraction and Related Ground Control Challenges

    By Bruce K. Hebblewhite

    This paper provides an overview of the international ?state of the art? with respect to underground coal mining methods used in seams of thickness greater than 4.5 m, through a review of a selection o

    Jan 1, 2013

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Strata Movement Around Large Mining Height Face Area with Fully Mechanized Method in Steeply Dipping Thick Seam

    By Yongping Wu

    The steeply dipping coal seams in this paper refer to those with the angle of inclination ranging from 35° to 55°. The reserves of the steep coal seams account for approximately 15%~20% of the total c

    Jan 1, 2014

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof Falls

    By Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger

    "Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the

    Jan 1, 2015

  • SME-ICGCM
    A Comparison Of Overburden Response Due To Longwall Mining

    By David K. Ingram

    The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i

    Jan 1, 1994

  • SME-ICGCM
    Effects of Overburden Characteristics on Dynamic Failure in Underground Coal Mining

    By Douglas Tesarik, Mark K. Larson, Habte Abraham, Heather E. Lawson

    Dynamic failures, or "bumps", remain an imperative safety concern in underground coal mining, despite significant advancements in engineering controls. While many factors have been empirically linked

    Jan 1, 2016

  • SME-ICGCM
    Applications of ARMPS (Version 6) to Practical Pillar Design Problems

    By Christopher Mark

    The Analysis of Retreat Mining Pillar Stability (ARMPS) program has been used to evaluate room and pillar retreat mining layouts since it was first released in the mid 1990s. After the Crandall Canyon

    Jan 1, 2011

  • SME-ICGCM
    Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its Application

    By Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu

    "A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand

    Jan 1, 2016

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    Development, Trials, and Testing of a Two-Component, Rapid-Set Cement Grouting System

    By Stephen C. Tadolini, Robert Hawker, Peter Mills, Colin Grubb, Tom Meikle

    "In unfavorable strata conditions, it is often necessary to install additional long tendon support as part of a primary support cycle. Although these support systems provide the required additional st

    Jan 1, 2017