Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Close-In Construction Blasting -- Impacts and Mitigation Measures
By Andrew F. McKown
This paper will discuss the mechanisms of potential damage from close-in construction blasting, concentrating on two mechanisms: elastic ground vibrations and non-elastic (permanent) ground deformatio
Jan 1, 1991
-
The Influence of Electronic Delay Detonators on Vibration Fragmentation, Heave and Blast Throw
By AJ Rorke
Blasting trials using Daveytronic Electronic Delay Detonator systems (EDD’s) were conducted at the Alpha Ferro Quany (Pretoria) and the Eikeboom Colliery near Witbank in November 1999. The objectives
Jan 1, 2000
-
A Reanalysis of Fragmentation Data from the Red Dog Mine
By Finn Ouchterlony
"Recently detailed fragmentation data from blasts fired with electronic delay detonators (EDDs) in the Red Dog mine in Alaska were presented. They include a comparison with pyrotechnic detonators ford
Jan 1, 2012
-
Assessment of Damage inRock Subjected to Explosive Loading
By Dal Sun Kim, Michael K. McCarter
"Comminution (crushing and grinding) of rock materials is energy-intensive and expensive. Mucheffort has been directed to improve the efficiency of conventional milling practice, but relatively little
Jan 1, 1993
-
Journal: Safety Talk / Safety Shortcuts -- The Longest Distance Between Two Points
By Steven D. Sandbrook
A man by the name of Louis Binstock once said, “Too often the shortcut, the line of least resistance, is responsible for evanescent and unsatisfactory success.”
Jan 1, 2015
-
Investigation of Firing Patterns on Sandstone Benches of a Surface Coal Mine - A Case Study
By Piyush Rai
Proper use of fi ring pattern vis-à-vis the blast requirements can provide optimal blast performance in terms of fragmentation. Further to this, each fi ring pattern has its own characteristic, for in
Jan 1, 2008
-
Lessons Learned from Blasting in Highly Weathered Sandstone
By Tyler Rockley, Greg Bailey
This paper is an engineering case study of a blast performed on a highly weathered sandstone isthmus in an area sensitive to vibration and airblast, the challenges associated with such a blast, the me
-
Anfo Versus 100% Emulsion: Quantitative Assessment of Performance With Constant Drilling and Blasting Costs
By Neal Lee, Braden Lusk, John Silva Castro
One of the most common assumptions regarding the use of ANFO versus utilizing 100% sensitized emulsion is that ANFO “turns over” the muck-pile better, due to the “higher gas volume” supposedly inheren
Jan 1, 2012
-
Bingham Canyon Mine-Blasting Through and Next to Active Underground
By Robert Cefalo
Drill and Blast Engineer Abstract In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground
-
Acoustic Response of Structures to Blasting
By Braden Lusk
This paper includes results from analysis of recorded Acoustic Responses of Structures to Blasting. The analysis was performed to determine specific characteristics of sounds experienced inside homes
Jan 1, 2009
-
Journal: 18th Annual Photo and Art Contest - Honorable Mention: "Pitt River Bridge"
By Corry Goumans, Dan Agostino
Photo 1. Demolition work on the Pitt River Bridge. The drill crew is using the 3800 Gardner Denver Air Track to drill the holes on the Bridge turning dolphin. The barge in the background is used for s
Jan 1, 2013
-
Utilizing Structured Public Involvement in Community Meetings around Blasting Operations
By Joshua Micah Hoffman
While it is easy to state that meaningful involvement of the community can play a critical role for a successful blasting operation, following through with this involvement is not an easy task. Struct
Jan 1, 2014
-
Wipfrag and Wipjoint Measurements to Record and Predict Blast Results
By Franklin J. A, Tam C. Palangio, N H. Maerz
WipFrag systems I, II and III have become the world standard in photoanalysis systems to measure particle sizes. Mines, quarries and excavating contractors can now easily measure blast results and tra
Jan 1, 1998
-
Prediction of Ground Vibrations Using Neural Network in a Peruvian Mine
By Pavel A. Torres, Darwin Torres, Sandro Huaman
Given the limited efficiency of blast-induced ground vibrations prediction empirical models, due to the complex geological system from a Peruvian mine. An artificial neural network was built in order
Feb 1, 2020
-
The Bubble Mystery
By Richard Dooley
This paper is one sided because it presents the problem, but not the solution. The problem of blisters (bubbles) and occasional tears in caisson liners occurred when blasting and we have not found a c
Jan 1, 1983
-
Gap Sensitivities of Water-Gel Explosives
By V Krishna Mohan, J Edmund Hay
This paper discusses the results of the gap sensitivity measurements made on water-gel explosives, sensitized by monomethylamine nitrate (MMAN) and flake aluminium, and one emulsion explosive. This st
Jan 1, 1982
-
Removal of the Top of an Aged Water Supply Reservoir By Explosives
By Chuck Kliche, Bill Clements
This project involved the removal of the top of an old water supply reservoir tank for the City of Lead, SD by explosives. The general contract called for the removal of the concrete top without damag
Jan 1, 2007
-
Journal: Recent Projects / Toledo Edison Steam Plant Twin Stacks
The quiet banks of the Maumee River in Toledo, Ohio, received a wake-up call July 16 as two smokestacks in the Marina District were leveled with dynamite. B&B Wrecking, Inc. of Cleveland contracted th
Jan 1, 2015
-
Precise Timing Influence on Fragmentation Distribution by New Modelling Process
By C. Partouche, T. Bernard
Blasting engineers are mainly concerned about fragmentation issues. Even further, this is the final goal of using explosives. A lot of models have been developed for controlling fragmentation distribu
Jan 1, 2002
-
Blasthole Length, Subdrilling and Stemming Analysis in an Iron Mine
By Sarah Guzzelli, Enrigue Munaretti, Anneliese Botelho, Jair Koppe
Drill and Blast (D & B) is one of the main operations in the mining production cycle, which aims to fragment rock according to a pre-defined plan for proper loading, haulage and processing specificati
Jan 1, 2014