Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Trench Cutter - The Multi Purpose Solution

    By Alexander Blatt, Franz-Werner Gerressen

    Power Point Presetation at DFI 2022

    Sep 1, 2022

  • DFI
    Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy

    By Jack Taggart, Chris Barker

    Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor

    May 1, 2022

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Limiting Damage To Historic Structures In New York City, 1981 To Present

    By Andrew J. Ciancia

    The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t

    Jan 1, 2008

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • DFI
    Practical Reuse of Foundations in High Rise Construction

    By William H. Walton, Clyde N. Baker Jr., Darren S. Diehm

    "A 51-story concrete core and steel frame commercial office tower was recently constructed on the site of the former US Gypsum building in downtown Chicago, Illinois, USA The structure foundation reus

    Jan 1, 2005

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)

    By Cassandra A. Wetzel

    "Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

    Jan 1, 2017

  • DFI
    Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical Investigation

    By Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien

    "Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th

    Jan 1, 2016

  • DFI
    Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program

    By William Billiet

    "The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp

    Jan 1, 2017

  • DFI
    Performance of Cement Deep Mixing Method in 2011 Tohoku Earthquake

    By Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa

    "Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c

    Jan 1, 2015

  • DFI
    Automation Of Pile Foundation Design Post-Processing To Produce Pile Plans

    By Rajasekar Subbian, Jessica Oudhof

    In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level

    May 1, 2022

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Small-Strain Behaviour of Artificially Cemented Sand in Deep Mixing Application

    By Stephen Darmawan, Mahdi M. Disfani, Arul Arulrajah, Alireza Mohammadinia

    Deep mixing using cementitious compounds is an in-situ method of ground improvement for improving the strength, compressibility of loose sand. Artificial light cementation can increase the stiffness o

    Jan 1, 1900

  • DFI
    Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, Connecticut

    By Theodore von Rosenvinge

    Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har

    Jan 1, 2011

  • DFI
    Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System

    By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim

    "In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality

    Jan 1, 2005

  • DFI
    Lateral Capacity of Drilled Shafts Considering Push-Pull Resistance

    By Ke Yang

    "Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent

    Jan 1, 2005

  • DFI
    Pile Foundation Response to Ground Vibration from Rock Blasting

    By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui

    "Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign

    Jan 1, 1900

  • DFI
    The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension Piles

    By Qingwei Joshua Ong

    Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd

    Nov 1, 2022

  • DFI
    Evolution Of Helical Screw Pile Design And Installation

    By Michael Perlow

    Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati

    Jan 1, 2011