    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • DFI
    Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead Signs

    By Roy H. Borde

    The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio

    Jan 1, 1988

  • DFI
    Deep Soil Mixing for Contaminated Soil Remediation at a Superfund Site

    By Larry Stearns, Lori Tiefenthaler

    Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re

    Jan 1, 2018

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002

  • DFI
    Float-In Cofferdams

    By Robert B. Bittner

    Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned

    Jan 1, 2013

  • DFI
    The Use of the Expander Body with Cast in Situ Piles in Sandy Soils

    By Mario A. Terceros H., K. Rainer Massarsch

    "ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi

    Jan 1, 2014

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • DFI
    Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. Introduction

    By John Lemke

    Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin

    Jan 1, 2002

  • DFI
    Minipiles And Jet-Grouting: A Strong Foundation In Parma, Italy

    By Bruno Gemmi

    The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid

    Jan 1, 2011

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017