Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Impact And Ramifications Of Setup For Pile Foundations
By Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Holding Back The Watchung Mountains
By Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?
By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Recent Experience With The Omega Pile And New Applications - Synopsis
By Maurice Bottiau
The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the
Jan 1, 1996
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests
By Jesús E. Gómez
This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa
Jan 1, 2008
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study
By M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
-
Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management
By Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Liquefaction Mitigation Synthesis Report
By Timothy C. Siegel
This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun
Aug 1, 2013
-
-
Dynamic Testing For Bored Pile Bearing Capacity - Summary
By Jörn M. Seitz
Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use
Jan 1, 1987
-
Current Pile Foundation Practice In Taiwan ? Synopsis
By Za-Chieh Moh
This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize
Jan 1, 1996
-
Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us
By Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations
By Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Load Testing Of Deep Foundations Using The Osterberg Load Cell
By David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
-
-
Technical Visit
By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Spin-Fin Pile Technology
By Dennis Nottingham
Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,
Jan 1, 1990
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant
By Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002