Unknown Bridge Foundation Investigation With Nondestructive Methods ?The Combined Parallel Seismic/Seismic Cone Penetrometer Method
By Larry D. Olson
Research, hardware development, and field testing have been conducted on systems to allow easy and accurate determination of both foundation tip depth as well as the properties of the soils at and abo
Jan 1, 2007
-
Geo-Foundations Project Information Management Systems on a Budget
By Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"
By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
Lateral Stresses On Multilevel Tieback Walls
By Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
Soil Fatigue Analysis for Pile Driving Simulations Using an Impact Hammer
By Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer
"For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h
Jan 1, 2017
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam
By Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)
By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Improvement of Soil Properties by Basalt Fibre Reinforcement
By Ramanathan Ayothiraman, Anurag Singh
"An experimental program was undertaken to investigate the effects of randomly distributed basalt fibre on the index and engineering properties of Dhanori clay and to compare its performance with the
Jan 1, 1900
-
Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation
By Michael Arnold
"BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d
Jan 1, 2015
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - Synopsis
By George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Observing Friction Fatigue using High Strain Dynamic Pile Testing
By Ronald Damen, Dion Denes
"Friction fatigue is the loss of soil-pile friction around the shaft area of the pile. It has been observed during impact driving of piles, and has been modelled to a limited degree using physical sca
Jan 1, 1900
-
Modeling Of MSE Wall - Drilled Shaft Systems
By Matthew C. Pierson
Due to space limitations for transportation projects, many times sound walls must be constructed above mechanically stabilized earth (MSE) walls. These sound walls must resist lateral loads from wind
Jan 1, 2009
-
Verification of Installation and Performance of ACIP Piles for Bridges
By W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
Excavation-Induced Movement of Adjacent Foundations
By Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In Hawaii
By Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay Deposit
By Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Numerical Analysis of Progressive Failure of DM Columns beneath Embankment on Soft Ground
By Zhou Haizuo, Diao Yu, Zheng Gang
"The conventional design method for the embankment supported by DM columns usually assumes the simultaneous failure of all the columns. However, the progressive failure may occur in practice, especial
Jan 1, 2015
-
Deep Cfa Piles Application For Foundation In Queensland
By Sameh M. Khella
This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t
Nov 1, 2022
-
Recycled Polymer Application During Pile Boring Operations: A Review
By Hitendrabhai S. Dewangan, Dr. Aashish A. Mehta
Pile foundation is widely used in construction of marine structures. In offshore & marine piling work, drilling/boring supporting fluid is used to stabilize the borehole (excavation) prior to tremie c
Sep 1, 2022
-
TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure Load
By Don W. Dotson
In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be
Aug 1, 2013