Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange
By Travis Coleman, Elvis Ishimwe
Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic
-
Bio-Grout Based Soil Improvement
By Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis
By F Debidin
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu
Jan 1, 2010
-
Systematic Laboratory And Field Study On The Shear Resistance Of The Soil-Concrete Interface Of Diaphragm Walls And Bored Piles
By Matthias Pulsfort, Jiarui Du, Torsten Wichtmann, Achim v. Blumenthal, Diethard König, Rowena Verst
The influence of the interaction between support fluid and soil, e.g., filter cake formation, on the shear stress transfer in the soil-concrete interface of diaphragm walls and bored piles is still co
May 1, 2022
-
Deep Excavation with Well Point Dewatering in Soft Soil
By Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler
By Brad W. Taylor
"During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable
Jan 1, 2017
-
Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and Limits
By Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw
Jan 1, 2016
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton
By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)
By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments
By Robert C. Simpson, Ghada S. Ellithy
"There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi
Jan 1, 2015
-
Resonance Pile Driving with Zero Ground Vibration
By Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Installation And Testing Of 260 Hollow Core Bar Micropiles
By Jesús E. Gómez
A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n
Jan 1, 2007
-
Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WY
By Brent Wilkins
The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed
Jan 1, 2009
-
Liner Piles Used As Support To Kentledge For Initial Compression Load Test
By Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Pile Foundations for the San Francisco 49ers NFL Stadium
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)
By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project
By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process
By E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method
By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Construction Of A Spillwall In The Columbia River
By Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw