A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining
By Jiwen Zhang
Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ
Oct 1, 2009
-
PGM Ore Processing at Impala’s UG-2 Concentrator in Rustenburg, South Africa.
By Eugene Nel, Johan Theron, Chris Martin, Hans Raabe
"Impala Platinum Limited is the world’s second largest platinum producer, producing more than 1.7 million ounces of the precious metal last year, much of this from the UG-2 reef located in the Bushvel
Jan 1, 2004
-
From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator
By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin
"North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part
Jan 1, 2003
-
An Experimental Study on Fine Coal Desulfurization y Centrifugal Gravity Separation in a Dense Medium
By Youjun Tao
Falcon centrifugal gravity separation tests were conducted to study desulfurization and de-ashing performance with different size fractions of a high-sulfur Chinese -0.5mm fine coal in a dense medium.
Aug 1, 2013
-
Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate
By Carlos Avalos Casillas, Saul Ortiz Landeros
The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a
Jan 1, 2014
-
Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project
By J. A. McLennan
Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo
May 1, 2004
-
Freeport McMoran El Paso Refinery Steam Control
By Bradford C. Wesstrom, Ricardo Parra
The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at
Jan 1, 2019
-
Arctic Resource Development Challenges for Environmental Approvals
By Nick Poushinsky
OVERVIEW OF PRESENTATION ?Stantec?s Northern Presence ?Challenges for Northern Development ?Environmental Approval Challenges ?History/Expectations ?Baseline Data ?Consultation ?Regulatory Pr
May 1, 2009
-
Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine
By M. Sturzenegger
This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster
May 1, 2009
-
Rock Mechanics Aspects of the Use of Underhand Cut-and-Fill Paste Sill Pillars: Case Studies
By Paul Hughes
This paper summarizes current underhand paste backfill mining as applied to Goldcorp Inc?s Red Lake Mine, Newcrest Mining Ltd?s Kencana Mine and the Lanfranchi Nickel Mine as well as ongoing research
May 1, 2011
-
The Operating Range Method for Backfill Hydraulics
By D. J. Hallbom
This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l
May 1, 2007
-
A Simple Method to Estimate Tensile Strength and Hoek-Brown Strength Parameter mi of Brittle Rocks
By M. Cai
A practical simple method is proposed to estimate the tensile strength (st) of strong brittle rocks from the strength ratio of R= sc/st = 8 sc/sci, where sc is the uniaxial compressive strength and sc
May 1, 2009
-
Energy Savings and Improved Recovery with Small Grinding Media
By Michel Brissette
"To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th
Jan 1, 2009
-
Enterprise Optimization Releasing Value Through Better Planning Decisions
By Gerald Whittle
What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea
May 1, 2010
-
Carbon Dioxide Use for pH Control at Greens Creek Mill
By Tim Martin, Dave Tahija
"In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p
Jan 1, 2016
-
PT Redpath Indonesia and PT Freeport Indonesia Past and Future Development of Underground Mines
By Bruce Mennie
PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. The mining and concent
Oct 1, 2010
-
A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper Complex
By S. Banisi, M. Poorkani
The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ
Jan 1, 2005
-
Optimizing Grinding Circuits
By James Anstey
BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh
Apr 1, 2005
-
Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter
By Hongfei Li, JianLong Wang
This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for
Jan 1, 2019
-
Concepts for Co-Mixing Waste Rock and Tailings
Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.
Nov 1, 2002