Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fuelcell Versus Diesel Loader Operation: Cost-Benefit Analysis Study

    By Marc C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuelcell vehicles, a broadscoped project was initiated to quantify the costs associated with operating fuelcell vehicles and d

    May 1, 2003

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003

  • CIM
    Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentration

    By Andrew Bamber

    The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.

    Oct 1, 2004

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    The influence of geology on blast damage

    By S. P. Singh

    "The geological features of a rock mass have a direct influence on its blasting characteristics. It has been observed that perimeter control techniques provide excellent results in massive crystalline

    Jan 1, 2001

  • CIM
    The Gorgas, Alabama, Experiment in Underground Gasification of Coal

    By Milton Fies

    Introduction The first experiment in underground gasification of coal in the United States was conducted at Gorgas, Walker county, Alabama, under a co-operative arrangement between the U.S. Bureau

    Jan 1, 1948

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Dust Control at Steep Rock Iron Mines Pelletizing Plant

    By P. S. Capper

    "Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr

    Jan 1, 1976

  • CIM
    Ecological Engineering and Biological Polishing Methods to Economize Waste Management

    By M. Kalin

    "SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly

    Jan 1, 1988

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    Research and Development for an Ultra-Low Profile LHD

    By Patrick F. R. Murphy

    An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of

    May 1, 2004

  • CIM
    Collaborative/Syndicated Research in Mineral Processing

    By Terry Braden

    "Meeting probable world mineral demand in the years ahead will almost certainly require an ability to economically treat lower grade and more complex ores. Achieving this will require extensive resear

    Jan 1, 2009

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By Denis Thibodeau

    his paper describes a study of an altered mining extraction and the resulting Rockmass response at VALE?s Creighton Mine. Typically, the deep mining zones have strict stope extraction guidelines to

    May 1, 2013

  • CIM
    Diamond Recovery Technologies

    By John Lindsay

    Outline ??Recovery plant requirements and concepts ??Common recovery plant unit processes ??Recovery plant design considerations ??Peripheral issues Process Design ??Liberation ??Separation ??

    Apr 1, 2005

  • CIM
    Fracture characterization in granite using ground probing radar

    By Arthur L. Holloway, James C. Mugford

    "The Underground Research Laboratory (URL) is located in southeastern Manitoba, in the Lac du Bonnet granite batholith of the Canadian Shield. It was constructed by Atomic Energy of Canada Limited (AE

    Jan 1, 1990

  • CIM
    Development of Emiprical and Numerical Design Techniques in Burst Prone Ground at Goldcorp Inc.?s Red Lake Mine

    By Pravin Kumar

    Goldcorp Inc.?s Red Lake Mine (RLM) is situated in the Red Lake Mining District, a history rich North Western Ontario mining community. Red Lake Mine formerly known as the Dickenson Mine has experienc

    May 1, 2002

  • CIM
    Maboumine Process: A Promising Process for Developing a Polymetallic Ore Deposit - Focus on the Downstream Part of the Process: Rare Earth Recovery

    By S. Belair, V. Weigel

    As a growing mining company, ERAMET is looking for new positions on the strategic metals market. In this context, the Gabonese Maboumine pyrochlore deposit is currently being studied for the recovery

    Jan 1, 2014

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000