Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Arc Exploration from the Hydrothermal Plume Perspective

    By C E. J de Ronde, I C. Wright

    Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor

    Jan 1, 2002

  • AUSIMM
    Swelling of High Grade Iron Ore Pellets Reduced by Hydrogen in a Fixed Bed

    A study of the swelling behaviour of a single batch of high-grade iron ore pellets during hydrogen reduction in a fixed bed showed that the extent of swelling is governed by the nucleation and growth

    Jan 1, 1978

  • AUSIMM
    The Mount Victor Gold Mine, Eastern Highlands Province, Papua New Guinea

    By Sie A

    After completing a feasibility study in 1987, Niugini Mining Limited (NML) obtained five Gold Mining Leases within PA 632, covering the Mount Victor and Clarkes Ridge gold deposits. Reserves prior

    Jan 1, 1991

  • AUSIMM
    Underground Sampling. Methods at the Great Cobar Mines, Cobar, N.S.W.

    THE Great Cobar Company Limited owns 1100 acres of freehold, which include the Great Cobar Oopper Mine and smelters, the Cobar Gold Mine, the Cobar-Ohesney Copper Mine, and the Great Peak Gold Mines.O

    Jan 1, 1919

  • AUSIMM
    Inertisation of coal augering holes

    By B Leisemann, M Watkinson

    Coal augering is an ideal method for recovering coal from the highwalls of open cut coalmines. Coal augering is a simple process whereby additional flights are added to the auger cutting head and auge

    Aug 28, 2017

  • AUSIMM
    Iron Isotope Fractionation in Magmatic-hydrothermal Minerals – A Porphyry Copper Case Study from the Batu Hijau Deposit, Sumbawa, Indonesia

    By C M. Wawryk, S L. Garwin, J D. Foden

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Batu Hijau porphyry Cu-Au deposit in south-western Sumbawa, Indonesia is an ideal natur

    Mar 18, 2015

  • AUSIMM
    Hydrometallurgical Extraction of Tungsten from Low Grade Residue Dumps

    The alkaline ethylenediamine tetra-acetic acid (EDTA) leach process for extracting tungsten from scheelite (CaW04) ores has been examined for the treatment of low grade (<0.5 per cent WO,) residue

    Jan 1, 1983

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010

  • AUSIMM
    The Port Hedland FINMET« Project - Fluid Bed Production of High Quality Virgin Iron for the 21st Century

    By Mayfield P. L J, Honeyands T. A

    BHP's two million tonne per annum nominal capacity Hot Briquetted Iron (HBI) plant at Port Hedland in the Pilbara region of Western Australia is based on FINMET¦¦ direct reduction technology. T

    Jan 1, 1999

  • AUSIMM
    FLSmidth Flotation Developments - Dorr Oliver Machines

    By S Vianna, K Caldwell, R Silva, T Olson, D Bell

    Studies to enhance the FLSmidth forced air machine through changes in the design, showed important improvements through changes in the number of Rotor blades, stator designs, rotor air distribution an

    Jul 15, 2013

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • AUSIMM
    A Study of the Role of a Gas Phase in Segregation and Concentration of Trace Elements in a Magma

    An examination is made of some of the consequences of a magmatic gas phase developed during a late stage of differentiation of an acidic magma. Elements possessing halides with high partial pressures

    Jan 1, 1956

  • AUSIMM
    The Tennant Creek Goldfield

    The Tennant Creek goldfield is situated in the Northern Territory, 360 miles north of Alice Springs, or a tot~l distance of 1,300 miles north of Adelaide, and 600 miles south of Darwin. The auriferous

    Jan 1, 1942

  • AUSIMM
    Biodegradation of manganese dioxide tailings

    By Madgwick J. C

    Microaerobic biodegradation oflow-grade manganese dioxide slurry tailings was demonstrated in enrichment cultures treated with dilute molasses at 30°C and pH 5·8. Supplementary nitrogenous n

    Jan 1, 1986

  • AUSIMM
    Estimation for Engineering Design Purposes of the Principal Stress Directions in Rocks Containing Residual Strains

    Unrelieved residual strains can influence the states of stress in rock masses. If cheap, stable structures are to be constructed in Tock in which large pressures are exterted by unrelieved residual st

    Jan 1, 1964

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • AUSIMM
    The Elephant in the Mill

    Minerals processing needs a step change in energy efficiency. While the search for new technology breakthroughs is important, huge gains are still available by better using existing research outcomes.

    Sep 13, 2010

  • AUSIMM
    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Sep 13, 2010

  • AUSIMM
    The Use of Short-Delay Detonators in Some Queensland Collieries

    During recent years there has been a marked increase in the use of explosives in Queensland coal mines. Delay detonators have been introduced and their use has extended with the wider application of m

    Jan 1, 1958

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950