Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk QuantificationBy M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Characterising Rock Mass Properties for Fragmentation ModellingBy A Scott, I Onederra
A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu
Aug 24, 2015
-
The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern ChileBy O Rojas
The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h
Aug 22, 2011
-
Modelling the Impact of Rockmass and Blast Design Variations on Blast FragmentationBy S S. Kanchibotla, I Brunton
Most blast fragmentation models assume the rock mass properties, explosive properties and blast design variables to be constants and uniformly distributed within a blast. However, in reality all these
Jan 1, 2001
-
Improvement of Blasting Productivity at Brunswick MineBy B Ellis
Brunswick Mine is one of the largest underground zinc/lead mines in Canada, producing 3.4 million tones of ore annually. As mining activities advance to deeper levels, ground pressure also becomes gre
Jan 1, 2001
-
Flow Behaviour of High Solids Brown Coal-Water Suspensions as Liquid FuelsBy Christie GB, Mainwaring DE, Leong YK
High solids brown coal slurries have been prepared with concentrations approaching those achieved with bituminous black coals. The high inherent water content and macroporosity of Victorian brown
Jan 1, 1987
-
Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mineBy B J. Hutchison, S Gannon, J Chambers, D Oko-oboh
The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min
Sep 20, 2017
-
Electric Rope Shovels Versus Diesel Powered Hydraulic ExcavatorsBy M Johnson, M Horrigan
The scope of this report is to examine the aforementioned hypothesis by performing a detailed analytical comparison of a P&H electric rope shovel to an O&K diesel powered hydraulic excavator. In order
Jan 1, 2002
-
Geotechnical Centrifuge Technology for Characterising the Interaction of Tailings and Pore Water over Decadal Time PeriodsBy D Anderson, W Timms
"A geotechnical centrifuge can characterise and model the interaction of tailings and fluids over very long time periods by accelerating drainage and consolidation processes. This technology can be co
Jul 27, 2015
-
Simulation Model of Gas Injection Aided Dewatering in Underground MiningBy Kesser Z, Vincze T
The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha
Jan 1, 1988
-
A Case History of a Deep Excavation in a Big Circular Shaft in Singapore Marine ClayBy H Zhang, A Lawrence
To accommodate the fast growing need for services in Singapore’s Marina Bay downtown area, Marina South, the construction of a common services tunnel (CST) was required. The CST includes various servi
Sep 17, 2014
-
Managing the Margin at Norseman, Western Australia – A Case StudyBy B P. Micke
Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat
Mar 24, 2014
-
Sensor-based particle sorting: technical and economic evaluation of the applicability in a zinc ore mineBy P Esteves, J L. Bechir, R Galery, C Senna, V Souto
The current moment experienced by the mineral industry is marked by a series of economic, social and environmental challenges. Among the main challenges, it is important to highlight the decreasing in
Nov 10, 2020
-
Underground Mining Operations at The Selwyn ProjectSince the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill
Jan 1, 1988
-
Work Organisation for Attractive Mining – Lean Mining and the Working EnvironmentBy J Johansson, J Lööw
Attractive mining workplaces are good, safe and healthy environments. They are also workplaces that the workforce of the future wants to work in. As skilled miners and engineers are already scarce, th
Nov 4, 2015
-
Stability of Underground Coal Mine Openings and Structures with Particular Reference to Vibrations from Surface Mine BlastsBy Prakash AJ, Singh PK, Dhar BB
Safety and stability of underground mine openings, coal pillars and water dams in the near vicinity of operating surface mines are endangered from excessive blast induced vibrations. This paper deal
Jan 1, 1995
-
Geostatistical Parametrisation for Grade Control of Stratiform Banded Iron Formation in 'Singhbhum - Keonjhar - Bonai' Belt of IndiaBy Sarkar B. C, Sen A. K
India is well endowed with vast reserves of banded hematite ore, about 12 billion tonnes, estimated by some conventional methods. Various authors have assessed this huge reserve using some advanced
Jan 1, 1995
-
Studies on Extraction of Refractory Gold and Silver Through Thiourea LeachingBy Akerkar D. D, Dey M. L, Mathur S. B, Chowdhury S. K R
The extraction of gold and silver from chalcopyrite concentrates has been investigated. In view of the recent interest in non-cyanide leachants for gold and silver, one such alternative reagent, nam
Jan 1, 1992
-
How to Evaluate AG/SAG Test WorkAutogenous and Semi-Autogenous grinding has become an accepted method of reducing primary crusher product to micron sizes in a single or a two-stage grinding circuit. The elimination of secondary an
Jan 1, 1991
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014