Search Documents

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • SME
    Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54

    By J. J. Gusek

    Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions

    Feb 24, 1997

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • CIM
    The Weird World of the Nanoscale

    By Michael B. Cortie

    The young field of nanotechnology has as its objective the design and construction of useful devices made of nanoscale materials. Objects or structures which have at least one important dimension in t

    Oct 1, 2003

  • SME
    Eight problems examined that point out serious inadequacies in testing for drug use

    By James L. Weeks

    Introduction This paper attempts to summarize some of the major criticisms of drug testing. Eight problems with drug testing are discussed. These are: • It does not measure something employers have

    Jan 11, 1987

  • SME
    Expansion And Modernization Of An Iron Ore Pelletizing Plant In Northern Sweden

    By M. Ahrens

    The paper describes the main drive systems of an iron ore pelletizing plant and related important design aspects. It is shown how today?s drive systems provide the desired flexibility for the process

    Jan 1, 2008

  • NIOSH
    IC 6505 How and why Fatalities Occurred in Pennsylvania Bituminous Coal Mines During the Five-Year Period 1926 - 1930

    By W. J. Fene

    A comprehensive study of all bituminous coal-mine fatalities occurring in Pennsyl¬ vania during the 5-year period, 1926-1930, was made to try to determine the factors that in¬ fluence accidents which

    Sep 1, 1931

  • TMS
    Thermal Behavior of Mixed Household Portable Batteries

    By Denise Crocce Romano Espinosa

    The recycling of waste of electric and electronic equipment (WEEE) is one of the main modern challenges. Among the variety of WEEE, batteries can be set apart due to their composition and their growin

    Jan 1, 2009

  • SME
    P.T. Freeport Indonesia Concentrator Expansion

    P.T. Freeport Indonesia's latest expansion has increased total mill throughput to 125,000 dry metric tonnes per day. The most recent expansion included the installation of a Semi Autogenous Mill

    Jan 1, 1996

  • NIOSH
    RI 6218 Mount Gran Coal Deposits, Victoria Land, Antarctica

    By John J. Mulligan

    The Bureau of Mines investigated coal deposits at Mount Gran (latitude 76°59' S, longitude 161°07' E), Victoria Land, Antarctica, during the austral summer of 1959-60 as part of the continui

    Jan 1, 1963

  • CIM
    Gold Gravity Recovery at the Mill of Les Mines Camchib Inc., Chibougamau, Québec

    By L. Lui, A. Cauchon, A. R. Laplante

    "The gravity circuit at Les Mines Camchib Inc. consists of two pinched sluices to bleed a feed to one of two 76 cm (30"") Knelson concentrator. The Knelson concentrate is upgraded to smeltable grade w

    Jan 1, 1990

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993

  • AIME
    Logging and Log Interpretation - A Report on the Displacement Log

    By R. H. Winn

    A method for the selection of the most suitable corrosion inhibitor for a particular system is given. The method involves the evaluation of surface passivity by means of copper ion displacement after

  • NIOSH
    OFR-133-85 A Study Of Design And Development Of A Coal Injector For Coarse Slurry Transport

    By Boyd Wise

    A jet pump injector was developed and successfully tested, thereby demonstrating the feasibility of a jet injector for introducing coarse coal into an operating slurry face haulage system: In Phase I

    Jan 1, 1985

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • CIM
    Rabbit Lake project – environmental impact

    By R. L. J. Phillips

    "The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental

    Jan 1, 1989

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • NIOSH
    Capital And Operating Cost Estimating System Manual For Mining And Beneficiation Of Metallic And Nonmetallic Minerals Except Fossil Fuels In The United States And Canada ? 1. Introduction ? 1.1 Need For The Handbook

    The United States Bureau of Mines is establishing a computerized mineral inventory system to help the Federal Government appraise its mineral position and prepare programs insuring against critical sh

    Jan 1, 2012

  • NIOSH
    OFR-106-81 A Training Program For Conventional And Raise Drill Shaft Construction Personnel

    By J. Bongarra

    This report describes the development of the instructional design and content of a training program for shaft construction miners and supervisors. The recommended training approach is based on the res

    Jan 1, 1979

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989