Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    Geometrical Description of Gateroad Roof Sag

    By Zbigniew Lubosik, Stanislaw Prusek

    "The main elements of hard coal extraction systems in the Polish mining industry, including the characteristics of gateroads, are described, followed by several dozen underground measurements of gater

    Jan 1, 2010

  • SME-ICGCM
    Frictional Properties of Rock Applied to Mining Excavations

    Results of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in

    Jan 1, 1987

  • SME-ICGCM
    Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a Curve

    By Chris Strawson

    Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr

    Jan 1, 2007

  • SME-ICGCM
    Vertical Load Capacities of Roof Truss Cross Members

    By David F. Gearhart, Khaled M. Mohamed

    "Trusses are primarily used as passive roof supports in coal mines. They are constructed of three main parts: two grouted bolts installed at opposing forty-five degree angles into the roof so that the

    Jan 1, 2015

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Spreading of Ground Pressure Fluctuation in the Gob

    By Katya V. Babenko, Victor V. Nazimko

    We address the problem of the stochastic nature of ground pressure manifestation. Stress distribution in a rock mass and ground irreversible movement are governed with a set of random factors that aff

    Jan 1, 2017

  • SME-ICGCM
    Challenges of Room and Pillar Mining at 900 M Depths in the Czech Republic

    By William J. Schloemer

    INTRODUCTION The history of coal mining the Ostrava Region of the Czech Republic goes back nearly 250 years. Both coking coal for steelmaking and thermal coal for the production of energy are mined h

    Jan 1, 2014

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    A Holistic Examination of the Geotechnical Design of Longwall Shields and Associated Mining Risks

    By Russell C. Frith

    This paper examines the design of longwall shields, focusing on those aspects that are critical to either their successful application or contribution to failure during longwall extraction. In many i

    Jan 1, 2013

  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Development of An Enhanced Methodology for Ground Movement Predictions Due to Longwall Mining in the Illinois Basin

    By Zach G. Agioutantis

    The Illinois Basin has an extensive history with the use of mechanized longwall mining dating back to the early 1970?s. In recent times, technological advances have resulted in increased panel widths

    Jan 1, 2014

  • SME-ICGCM
    Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams

    By Pengfei Wang, Guorui Feng

    With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large

    Jan 1, 2018

  • SME-ICGCM
    Whole-Mine Subsidence over Tabular Deposits and Related Seismicity

    By William G. Pariseau, Michael K. McCarter

    "The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc

    Jan 1, 2016

  • SME-ICGCM
    Analysis of Gateroad Stability at Two Longwall Mines Based on Field Monitoring Results and Numerical Model Analysis

    By David F. Gearhart, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen

    "Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and o

    Jan 1, 2018

  • SME-ICGCM
    Design Of Lower Seam Longwall Operations In Multiple Seam Mining

    By P. Forrest

    Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie

    Jan 1, 1988

  • SME-ICGCM
    Improved Roofbolting Methodologies: Reducing Hydraulic Fracture of Strata

    By David W. Evans

    "Induced hydraulic fracture of strata during roof bolt installation is a potentially prevalent, but masked phenomenon within the underground coal industry. Previously reported resin testing programs (

    Jan 1, 2015

  • SME-ICGCM
    In Situ Stress Measurement and Stress Change Monitoring in a Longwall Mine to Monitor Overburden Caving Behaviour and to Design a Hydraulic Fracture Treatment Program

    By Rob G. Jeffrey, Ken W. Mills, Jesse W. Puller

    "A coal mine in New South Wales is longwall mining 300m wide panels at a depth of 160-180m directly below a 16-20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to mana

    Jan 1, 2015

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018