Determining concentration and velocity profiles of non-Newtonian settling slurries using electrical resistance tomography - Synopsis
By A. P. N. Sutherland
Pipelines for transporting high concentration slurries are often designed using methods applicable to homogeneous non-Newtonian laminar flow. Many industrial slurries though comprise coarse particles
Jan 1, 2008
-
Process design of the Phola coal preparation plant - Synopsis
By G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - Synopsis
By G. S. Maré
Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas
Jan 1, 2010
-
The Road To NPV+
By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
An Economic Model For Gold And Platinum Mining Using Selective Blast Mining
By I. Bock
Selective Blast Mining (SBM) makes use of milli-second sequential blasting technology to separate the valuable reef material from waste rock in the blasting operation at stope faces in the mining of t
Jan 1, 1998
-
A Potential Method Of Containing Rockburst Damage And Enhancing Safety Using A Sacrificial Layer
Rockbursts continue to be a scourge in the mining industry, being responsible for accidents and damage to mining excavations. Although the problem has been present for more than a century, and althoug
Jul 1, 2013
-
Modelling Combustion And Thermal Nox Formation In Electric Arc Furnaces For The Production Of Ferro-Silicon And Silicon-Metal
By S. T. Johansen, C. Colomb, B. Ravary
Combustion and thermal NOx formation have been modelled using the Computational Fluid Dynamics (CFD) commercial code Fluent 6.1. The aim was to predict and give a better understanding of the combustio
Jan 1, 2007
-
The Improvements To Copper Casting Machine For Ferroalloys
By A. More, J. M. Míguez, J. Bullón
In 2000 Ferroatlantica started a project with the aim to develop a new casting machine for silicon and other ferroalloys. Until now, it has been cast more than 25.000 tons of silicon for the chemical
Jan 1, 2007
-
Automated Structure Mapping Of Rock Faces
By M. K. Elmouttie, G. V. Poropat
Mapping of exposed rock walls provides data on geological features such as joints, bedding planes, faults etc critical to the economics and the safety of mine operations. Traditional, manual methods o
Jan 1, 2006
-
Grab sampling for underground goldmine grade control ? Synopsis
Geologists in some underground gold mines collect grab samples from broken ore piles or trucks as a method of grade control. It is often known as muck sampling. Generally, the goal of grab sampling is
Jan 1, 2010
-
Establishing A New Metric For Mineral Resource Management
By A. S. Macfarlane
Mineral resource management (MRM) practice has developed in South Africa over the course of the last ten years, with the purpose of integrating previously isolated technical functions into a value cha
Jan 1, 2006
-
Stabilizing And Bracket Pillar Design To Reduce Seismicity
By F. M. C. C. Vieira
The work described forms part of a Safety in Mines Research Advisory Committee (SIMRAC) funded project, currently an ongoing programme of research aimed at providing ?improved criteria, guidelines and
Jan 1, 1998
-
Backfilling Waste Material Composites Environmental Impact Assessment (95dd6eef-7bf4-4fa8-be57-02effe87a6a7)
By J. Kortnik
Mining has always been, and still is, an activity which is vital for the development of mankind. This is because a predominant proportion of industrial products and energy is produced from raw materia
Jan 1, 2003
-
Effect Of Dual Phase Microstructure On The Toughness Of A Cr-Mo Low-Alloy Plate Steel - Synopsis
By L. J. Leach
Quench and tempered Cr-Mo plate steel was found not to contain a fully martensitic structure as a result of either slow slack quenching or insufficient hardenability at the cooling rates used. The res
Jan 1, 2013
-
The preparation of plans and diagrams at South African mines. Where is the boundary between the roles of mine and land surveyors? - Synopsis
The newly implemented mineral law framework exacerbated the need to clarify the roles and responsibilities of mine and land surveyors in the preparation and registration of plans and diagrams. The mai
Jan 1, 2010
-
Reductant Characterisation And Selection: Implications For Ferroalloys Processing
By R. Khanna, M. Dubikova
A variety of carbonaceous reducing materials are being used for the production of ferroalloys. Reductant materials include not just carbons such as coke, coal, char but also bio-carbons in form of cha
Jan 1, 2004
-
Support Pressure Estimation For Circular And Non-Circular Openings Based On A Parametric Numerical Modelling Study
By H. Yavuz
Closed form solutions assume opening shape to be circular to simplify the calculation of the ground response curve for the design of underground openings. However, in mining and civil engineering work
Jan 1, 2006
-
Representation of coal and coal derivatives in process modelling (c1409317-ab54-4241-b307-06d0044846d0)
By J. A. Theron
"This paper provides guidelines on performing mass and energy balance modelling involving coal and coal derivatives. Usually, the inputs to a pyrometallurgical process would be specified in terms of e
Jan 1, 2015
-
An economic risk evaluation approach for pit slope optimization
By L. F. Contreras
In open pit mine design, it is customary for geotechnical engineers to define the appropriate slope design angles within practical limits. The conventional approach to slope angle design is based on t
Jan 1, 2015
-
Horizontal Stresses In The Hangingwall Of Tabular Stopes
By A. P. Squelch
The question of what stress condition exists in the hangingwall of tabular stopes remains topical and largely unanswered. Limited field data exist to quantify the situation and provide calibration for
Jan 1, 2002