Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use Of Controlled Modulus Columns In Retail & Industrial Development Projects
By Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago
By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Overcoming the Challenges Endured by the Quality Assurance and Quality Control Teams during the Construction of a Deep Cutoff Wall in East Alton, Illinois
By Raffaella Granata, Wesley Schmutzler, Matteo Bertoni
"The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation wa
Jan 1, 2017
-
Reanalysis Of Piles Under Static And Dynamic Lateral Loads
The process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p
Jan 1, 1989
-
Statnamic Pile Testing Case Studies
By Michael J. Brown
It is often necessary to undertake some form of pile testing to verify design calculations. Historically this has been limited to static and dynamic tests. Newer rapid testing methods such as Statnami
Jan 1, 2006
-
Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method
By Zhang Baoshan
In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed
Jan 1, 1991
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction
By Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Seal Slab / Steel Pile Interface Bond From Full-Scale Testing
By Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Application Of CFA Piles For Foundation Of A Shopping Centre On Long-Standing Dumping Ground
By Joanna Bzówka
Nowadays, there are some new requirements for the supermarket floors. The floors are loaded by high point- and moving-loads. In spite of this fact, it is necessary to ensure the stiffness of the floor
Jan 1, 2006
-
Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis
By B. N. Hira
A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t
Jan 1, 1996
-
Reinforcement of Existing Deep Foundations with Micropiles
By Mauricio Terceros, Martin Achmus, Freddy Lopez
The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,
Jan 1, 2018
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? Synopsis
By B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010
-
Underpinning The Existing No. 1 Subway Line At The World Trade Center
By Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary
By Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test
By Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation
By Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA
By P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven Piles
By Chris D. Thompson
In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the
Jan 1, 2002
-
Pile Load Testing At JFK International Airport - Synopsis
By J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis
By G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010