The Type Of Wharf Structure On Soft Soil With Undulating Weathered Rock Bed
By Sun Shao Xian
The Port of Shekou is situated at Shenzhen Bay on the east side of the Pearl River estuary. Geological condition of the site is quite complicated. On top of the sea bed, there is a layer of soft silt
Jan 1, 1991
-
Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study
By David A. Staab
Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog
Jan 1, 2004
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary
By Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
-
Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey Soil
By Murad Y. Abu-Farsakh
This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me
Jan 1, 2018
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles
By John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones
By Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles
By Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
-
Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt
By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? Synopsis
By N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction
By Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts
By Jorge Beim
Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci
Jan 1, 2012
-
Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction
By Hessam Yazdani
In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations
Jan 1, 2013
-
Mitigating Settlement with Pile-Supported Approach Slabs
By Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? Preface
By Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)
By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
CPT - Guided Installation Of Pressure-Grouted Displacement Piles
By Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
The Pile Foundation Of Tall Buildings In Shenzhen
By Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests
By Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting
By Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009