Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Foundation Reuse: Overcoming Resistance

    By Sara Anderson, Rachel Nicholls, Tim Chapman, Janice Windle

    "In city center sites around the world, and in particular in London, foundation reuse is becoming increasingly widespread as the ground is filled with detritus from previous developments. This paper s

    Jan 1, 2005

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    Installing Deep Foundations for North America's Largest LNG Projects.

    By Richard Shea

    Morris-Shea, an Alabama-based deep foundation contractor, is installing foundation piles at the sites of North America's two largest liquefied natural gas (LNG) terminals currently under construction.

    Apr 1, 2023

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    First Use In The USA Of The CSM Method For Use As Microtunnel Sending And Receiving Shafts

    By Brett K. Mainer

    In the summer and fall of 2007, Drill Tech Drilling and Shoring, Inc. designed and built three 24-foot inside diameter shafts in Northern California using soil mix panels for support. The soil mixing

    Jan 1, 2008

  • DFI
    Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - Synopsis

    By F Debidin

    The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu

    Jan 1, 2010

  • DFI
    Using Settlement-Control Piles To Enhance Mat Foundation Of A High-Rise Building In Orlando

    By Amr M. Sallam

    A case history of utilizing a mat foundation enhanced with ?settlement-control? piles to support a high-rise building in Downtown Orlando is presented. Original geotechnical engineering studies, perf

    Jan 1, 2009

  • DFI
    Determination Of Pile Spring In Stratified Layers

    By Sandeep Pattnaik

    Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi

    Nov 1, 2022

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022

  • DFI
    Analysis of Three Axial Load Tests on Large Bored Grouted Deep Foundations

    By Hayel M. El-Naggar, Marawan M. Shahien

    "Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if

    Jan 1, 2017

  • DFI
    Jet Grout Underpinning to Support the Waterman Hospital

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t

    Jan 1, 2019

  • DFI
    Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC

    By Karl A. Higgins, Michael D. Venezia

    The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o

    Jan 1, 2019

  • DFI
    USTA Geoseismic and Foundation Design Challenges

    By Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef

    "The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s

    Jan 1, 2015

  • DFI
    Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee Dam

    By Glen R. Andersen

    "Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is

    Jan 1, 2017

  • DFI
    Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation

    By Michael Arnold

    "BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d

    Jan 1, 2015

  • DFI
    Observing Friction Fatigue using High Strain Dynamic Pile Testing

    By Ronald Damen, Dion Denes

    "Friction fatigue is the loss of soil-pile friction around the shaft area of the pile. It has been observed during impact driving of piles, and has been modelled to a limited degree using physical sca

    Jan 1, 1900

  • DFI
    Performance of Large-Diameter Bored Pile Socketed In Sandstone and Siltstone in Thailand

    By Zaw Zaw Aye, Sereyroath Chea, Nutthapon Thasnanipan, Thayanan Boonyarak

    "As there are only limited numbers of bored pile constructed in sandstone and siltstone in Thailand, load transfer and settlement behavior of a pile in these rocks are still not fully understood. Majo

    Jan 1, 1900

  • DFI
    Performance Specifications For Drilled Piles

    By Dan Brown

    Deep foundation contracting for transportation projects in the United States has typically followed the design-bid-build model in which contractors bid on a specific work product according to relative

    Jan 1, 2006

  • DFI
    Experimental Study on Lateral Capacity of Single Pile Embedded in Cement-Treated Sand

    By Takeshi Maki, Kh. Adeel Tariq

    "The lateral resistance of the structure plays an important role during seismic event and it can be increased by using ground improvement. In this study an attempt has been made to investigate the eff

    Jan 1, 2017

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022