Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Wood Refuse Burning in the Central Steam Plant Hollinger Mine

    By E. T. Turner

    Introduction 1n assembling material for this paper on Wood Refuse Burning 1 turned first to the records of our early studies of the problem in order to learn how and why certain basic decisions were

    Jan 1, 1951

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    In-Plant Hydrogeochemical Mapping: A Tool to Localise Potential Deleterious Reactions Due to Water Quality in a Process

    By Mohamed Ourriban, Stéphanie Somot, Éric Proulx, Jean-Sébastien Marois, Marjolaine Drouin, Paul Blatter, Ahmed Bouajila, Claude Gagnon

    "The mining industry has to face increasing restrictions concerning the use of fresh water in Québec and throughout the world. Increasing recirculated water usage could lead to a better control of the

    Jan 1, 2012

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • CIM
    Meeting the Transportable Moisture Limit for Lead Concentrates

    By H. P. Jacobi

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 65 miles east of Hay River, N.W.T. on the south shore of Great Slave Lake.The milling operation started in the fall of

    Jan 1, 1975

  • CIM
    Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill Control

    By Murray Wood, Michael Schaffer, Makat Katom

    "An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin

    Jan 1, 2003

  • CIM
    Behavior of Iron at the Ambatovy Nickel Operation in Madagascar

    By B. Haugrud, E. McConaghy, M. Collins, G. Smith

    "Laterite ore processed by the Ambatovy Joint Venture in Madagascar is primarily limonitic in nature, containing about 40 to 45 wt.% Fe and 1.1 wt.% Ni. The process selected for treatment of this ore

    Jan 1, 2016

  • CIM
    Geologic Setting, Geochemistry of Alteration, and U-Pb Age of Hydrothermal Zircon from the Silurian Stog’er Tight Gold Prospect, Newfoundland Appalachians, Canada

    By G. R. Dunning, M. R. Wilson

    "Abstract - The early Paleozoic accretionary tectonic regime that was established along the Laurentian margin of the Newfoundland Appalachians provided a favorable setting for shear-hosted gold minera

    Jan 1, 2000

  • CIM
    Mill Liner Bolt Removal System

    By Michel Fontaine, Bruno St-Cyr

    "The mission of the CENTRE DE RECHERCHE INDUSTRIELLE DU QUEBEC (CRIQ) is to stimulate economic development by guiding businesses in their pursuit of innovation.With a comprehensive approach to their n

    Jan 1, 2000

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • CIM
    The Red Bluff gold-copper porphyry and associated precious and base metal veins, northwestern British Columbia

    By D. A. Rhys

    "The Red Bluff porphyry is a tabular 2 km long north-west trending Early Jurassic quartz diorite to monzodiorite body that intrudes a folded Triassic greywacke sequence in the lskut River area, northw

    Jan 1, 1995

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Flotation of a Copper-Gold Oxide-Sulphide Ore

    By T. Chong, R. Pesalj, B. Marchant, Z. Nikic

    "The Mount Polley copper/gold project is located in central British Columbia and is currently being developed by Imperial Metals Corporation. Extensive laboratory and pilot plant testing was required

    Jan 1, 1991

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008