Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Process Control with On-Stream Analysis at Pasminco Metals - EZ, Hobbart RefineryThe development of reliable and accurate solution sampling systems plus on-line atomic absorption spectrophotometers and voltammetric analysers at Pasminco Metals - EZ's (PMEZ) zinc refinery at
Jan 1, 1993
-
Modelling of the Turbulent Cross-Flow Classification in Special Consideration of Non-Steady StatesIn process industries, time-dependent random fluctuations of raw material characteristics and mass flow rates in bulk material or pulp flows cannot be always prevented for different reasons, eg bec
Jan 1, 1993
-
Design of the Melbourne City Link TunnelsBy S Porter, R Woodall, N Weeks
Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it
Jan 1, 1999
-
Modelling Heap Leach Operations with MetsimMetsim is proving to be a powerful tool when designing a heap leach operation. The most useful outputs arc determining the fluctuations in pregnant solution recovery rate, make-up water rate, gold r
Jan 1, 1994
-
How to Get Value Out of BenchmarkingBenchmarking of mining operations has been in vogue for a number of years: it seems teams are forever flying around the world to try to understand what other operations are doing. However, unless a be
Jan 1, 2003
-
Technical Aspects of Reopening Gold Mines in VictoriaBy McCarthy PL
Widespread interest in reopening Victorian gold mines, regenerated by increased gold prices, has highlighted the technical problems prevailing. A combination of historical lease legislation, minim
Jan 1, 1982
-
Brief Outline of Mount Isa Copper SmelterThe equipment and general smelter layout for the Mount Isa Copper Smelter were designed by engineers associated with the American Smelting and Refining Company and by Mount Isa staff engineers. The fi
Jan 1, 1953
-
The Practice of Mine Ventilation in Western AustraliaThis paper comprises a discussion of standards for comparing conditions in mines, of methods for measuring the flow of air, of a comparison of fan performances, and the application of these matters to
Jan 1, 1939
-
The Hazards of Gold Prospecting in Endangered Fauna Country (339bd426-e78b-4a4e-b68e-1c65c8486a19)Current NSW Government policy requires searching for more than just minerals during an exploration program - add endangered fauna and archaeological relics for a start.
Jan 1, 1995
-
Blended Cements in AustraliaAspects and anomalies in the present Standard Specifications for Blended Cements which may have operated in Australia against the development of the greater use of Slag Blended Cements are noted. E
Jan 1, 1979
-
Improvements in Fine Coal Recovery at the Moura Mine of Theiss Dampier Mitsui Coal Pty. Ltd.By Rosentreter N
Difficulties with froth flotation recovery and vacuum de- watering equipment for the treatment of fine coal have been investigated. Mechanical alterations to cyclone desliming banks, and flotation
Jan 1, 1978
-
The Conversion of Mineral Waste to Modern Materials Using GeopolymerisationDuring the past decade geopolymer technology has emerged as a possible solution for the effective stabilisation and solidification of waste materials. Amorphous to semi-crystalline geopolymers form by
Jan 1, 2000
-
To Explore or Not to ExploreAlthough giant strides have been made in the Australian mineral industry over the past quarter of a century in terms of mineral discoveries, self-sufficiency of commodities, contributions to expor
Jan 1, 1979
-
Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?By Williams P. A
Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and
Jan 1, 1992
-
Optimisation of copper treatment at Mount Isa Mines LimitedBy Canning RL, Pritchard J
The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes
Jan 1, 1986
-
A Study on the Cycle of Movable-Screen JigsBy Sun Yubo
A basic method for designing reasonable jig cycles for movable-screen jigs is presented in this paper. The reliability and effectiveness of the designed jig cycle was verified with tests performed o
Jan 1, 1993
-
Implementation of the Moura Recommendations - A Managers PerspectiveThe tragedy of the Moura No. 2 incident has lost much of its emotional mileage for those organisations that thrive on loss and suffering. However, for the families, workers, mine owners and operators
Jan 1, 1998
-
Exploiting Mineral Waste Products in the Republic of KazakhstanBy D A. Aitzhanova, E Zh Omirzakova
The Republic of Kazakhstan has well developed mining and metallurgical complex. In modern conditions, when deposits of useful minerals are running thin, it is very important to find additional sources
Jan 1, 2003
-
Evaluation of Person-Wearable Methane MonitorsBy E E. Hall, C D. Taylor, D S. Yantek
Regular monitoring for methane gas is required near working faces in gassy underground mines where the potential for methane ignitions is greatest. However, high concentrations of methane can also acc
Jan 1, 2005
-
The Hazards of Gold Prospecting in Endangered Fauna CountryCurrent NSW Government policy requires searching for more than just minerals during an exploration program û add endangered fauna and archaeological relics for a start.
Jan 1, 1995