Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Advances in Copper Solvent Extraction

    The recovery of Copper by solvent extraction was arguably the most significant hydrometallurgical development of the 1960's. However, only dilute solutions at relatively high ph. could be trea

    Jan 1, 1989

  • AUSIMM
    Tunnelling Induced Ground Deformations and their Effects on Adjacent Piles

    By H G. Poulos

    Prediction of ground deformation caused by soft ground tunnelling is an important problem facing design engineers. The ground deformations are caused by the closure of the gap formed around the tunnel

    Jan 1, 1999

  • AUSIMM
    Kicking the Bucket - A Case Study of Evolving Domains and Geological Modelling, Sunrise Dam Gold Mine, Western Australia

    By F Clark, B Catto

    The Mako domain comprises the Mako lodes at Sunrise Dam Gold Mine, Western Australia. This domain was initially bulk or æbucketÆ domained for the open pit resource in 2000, due to complexity in defini

    Jan 1, 2009

  • AUSIMM
    Caijiaying Dry Tailings Storage

    By R Jia, J T. Waldram

    "The Caijiaying lead zinc mine is located in China, north-west of Beijing, in Hebei Province. The region experiences severe winters, below -35°C, and warm summers, up to 30°C. The mine and con

    Oct 10, 2016

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Technical Note on an Improved Cyclosizing Technique

    The design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t

    Jan 1, 1974

  • AUSIMM
    Mining Explosives Security ù Complacency No Longer

    A mining companyÆs approach to managing the risk of theft of explosives and initiating devices should be underpinned by an organisation-wide policy developed with internal and external consultation. I

    Jan 1, 2004

  • AUSIMM
    An Approach to the Flotation of Complex Gold Ores Containing Some Free Gold and/or Some Gold Associated with Easily Floatable Sulphide Minerals

    This paper describes some experiences in the design of flotation reagent schemes for the efficient flotation of complex gold ores containing free gold and/or gold associated with easily flotable sulph

    Jan 1, 1997

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    Stability of Hydraulic Backfill Barricades

    Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe

    Jan 1, 1998

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Application of Historical Data to Estimate a Mineral Resource at the Engineer Gold Mine, British Columbia, Canada

    By I M. Platten, S C. Dominy

    The evaluation of historical goldfields is currently topical, reflecting a high gold price, improvements in knowledge and technology. and lack of greenfield sites. Many goldfields comprise narrow gold

    Mar 26, 2012

  • AUSIMM
    Exclusion Zone Calculation for Underground Explosives Storage

    By M B. Lovitt

    At present there exist few engineering calculations and principles to determine exclusion zones for personnel in the vicinity of underground explosive storage areas. This paper is written to encourage

    Mar 24, 2014

  • AUSIMM
    Paper No. 186. The Electrolytic Refining of Auriferous And Argentiferous Copper at Lithgow, in New South Wales.

    FOR some reason there is not any extensive literature in print on the electrolytic refining of copper, although the method is in general use in America and Europe. In Australia there are but three pla

    Jan 1, 1911

  • AUSIMM
    Real Option Valuation of Mineral Exploration/Mining Projects using Decision Trees - Differentiating Market Risk from Private Risk

    By A Chandra, P Guj

    Only a few complex real options can be valued using closed-form equations, such as the Black and Scholes formula, because these algorithms are restrictive and prevent the construction of practical pro

    May 24, 2012

  • AUSIMM
    The Plabutsch Road Tunnel in Austria

    By Pinter R

    Several major routes connecting Northern and Southern Europe or Asia run through Austria. These highways have to surmount the alpine range which traverses Austria from west to east. In order to en

    Jan 1, 1987

  • AUSIMM
    A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning Problem

    By Caelli T, Robey M

    Most research into planning of open pit mines has been based on evaluation of volume-element block models in terms of their net present value. The major issues revolve around two interdependent proble

    Jan 1, 1996

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Geotechnical Challenges in Narrow Vein Mining

    By J Hadjigeorgiou

    Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o

    Mar 26, 2012

  • AUSIMM
    Grade Distribution and Grade Control Procedures, Great Lady Gold Deposit, Eastern Goldfields, WA

    The Great lady gold deposit presented the challenge of providing a new grade control system for an usual type of orebody in the Eastern Goldfields. Mineralisation occurs as secondary enrichment about

    Jan 1, 1990