  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011

  • CIM
    Numerical Modeling of Mining-Induced Stress and Microseismic Response using FLAC3D

    By Shahé Shnorhokian

    A study was conducted on the seismic activities and associated rockburst events that took place at an underground Canadian metal mine over a period of five years. In the first stage, a back analysis o

    May 1, 2011

  • CIM
    A New DSO Iron Ore Producer in Labrador

    By John F. Kearney

    Labrador Iron Mines (?LIM?) Schefferville Projects consist of 20 major DSO deposits lying along a 120 km strike length in both the provinces of Newfoundland and Labrador and in Quebec. The town of Sch

    May 1, 2011

  • CIM
    Meadowbank Mine: Environmental Challenge North of 60

    By Stéphane Robert

    This document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US

    May 1, 2011

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • AUSIMM
    The Development of ‘Radial-in-Reef’ Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania

    By R Goddard

    An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as ‘Radial-in-Reef’ (RiR) stoping, the method employs the drill

    Mar 21, 2011

  • AUSIMM
    Strip and Line versus Blind Sink Shaft Sinking – The Ernest Henry Decision

    By C J. Carr

    The Ernest Henry Mine (EHM) is owned and operated by Xstrata Copper and is located in North-West Queensland, Australia. The mine is currently undergoing a transition from an 11 Mtpa open pit mine to a

    Mar 21, 2011

  • AUSIMM
    Trident Underground Gold Mine – The First Three Years

    By J Howard

    Following discovery in October 2004, commencement of development in February 2007 and first ore production in mid 2007, the Trident gold deposit, located in the Eastern Goldfields of Western Australia

    Mar 21, 2011

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011