Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023
By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023
By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023
By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023
-
Cohesive Soil Conditioning Practice for Earth Pressure Balance Tunneling - RETC2023
By Diana Diaz, Rakshith Shetty, Vitaly Proschenko, Mike Mooney
Cohesive clay soil poses a significant risk to earth pressure balance tunnel boring machines (EPBM) due to unstable face pressure, clogging potential, high cutterhead torque, poor muck flow, low advan
Jun 13, 2023
-
Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023
By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt
This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne
Jun 13, 2023
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023
By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023
By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant
The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water
Jun 13, 2023
-
Tunneling for High-Energy Physics in Menlo Park, CA - RETC2023
By Irene Bendanillo, Canon Cheung, Justin Lianides, Derek Penrice
The SLAC National Accelerator Laboratory’s two-mile-long particle accelerator generates the world’s brightest X-rays from its Linac Coherent Light Source (LCLS) freeelectron laser. This facility has d
Jun 13, 2023
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023
By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Large Diameter Shaft Excavation Support Design and Blasting Methods in a Dense Urban Environment for the Pawtucket Tunnel Project - RETC2023
By Frederic Souche, Andrew R. Klaetsch, Brian Hann, Nick Goodenow
This paper describes support of excavation (SOE) design and construction for three large diameter shafts excavated through glacial soil and controlled blasting in complex sedimentary rock formations.
Jun 13, 2023
-
Flood Resilience for San Francisco - RETC2023
By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin
The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re
Jun 13, 2023
-
Submerged Penetrations Through a Frozen Soil Shoring System - RETC2023
By Kyle Amoroso, Aaron K. McCain
Frozen soil shoring has been used for decades in the tunneling industry to provide temporary support of excavation for shafts and cross-passage excavations. However, horizontal penetrations through th
Jun 13, 2023
-
New Water Supply—Oslo - RETC2023
By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Innovative TBM Launching in Urban Areas - RETC2023
By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
Project Clean Lake’s First Large Diameter EPB TBM in Cleveland, Ohio - RETC2023
By Erica McGlynn, Brian Negrea, Lance Jackson
There was no need for the people of Cleveland to ask “Where does the raw sewage go? We want to know!” because it was clear. The raw sewage was being discharged into Lake Erie during heavy rainfall eve
Jun 13, 2023
-
Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023
By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan
The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J
Jun 13, 2023
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023
By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023
By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Launch of an Earth Pressure Balance Tunnel Boring Machine in Short-Mode on a Congested Site from Narrow Deep Shafts for The Alexrenew Project in Alexandria, Virginia: A Case Study - RETC2023
By Luis Fernandez-Deza, James Hawn, Dustin Mount, Jean-Marc Wehrli
The RiverRenew Tunnel System project in Alexandria, VA forms part of a CSO scheme aimed at reducing overflows of combined stormwater and sewage into the Potomac River during storm events. A major piec
Jun 13, 2023
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023
By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023