    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    A Revolution in Raise Boring – The Development of the RBR900VF

    By R J. Wood

    Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn

    Mar 24, 2014

  • AUSIMM
    Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel Cave

    By J B Tucker, A T. McGrath

    Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d

    Mar 24, 2014

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • SME
    Risk assessment for the use of booster fans in underground coal mines

    By F. Calizaya

    A booster fan is an underground ventilation device installed in the main airstream to handle the total quantity of air circulated to one or more working districts. It is installed in a permanent stopp

    Mar 1, 2014

  • SME
    Geopolitics and the strategic risks to mining

    By Andrew C. Katen

    The mining industry faces increasing geopolitical risk in the coming decades. Constraints such as resource nationalism, corruption and social license could grow to outweigh fundamental limitations li

    Mar 1, 2014

  • SME
    Waneta expansion project: Penstock tunnels

    By Ben Roderds

    The Waneta Expansion Project (WAX) is located near the existing Waneta Dam site at the confluence of the Pend d?Oreille and Columbia rivers, approximately 10 km (6.2 miles) south of Trail, BC, Canada.

    Mar 1, 2014

  • SME
    A Large Eddy Simulation Model of Air Flow and Pollutant Transport in a Deep Open Pit Mine Under Arctic Inversion

    By K. V. Raj

    As open pit mines continues to grow deeper, managing air pollution can become challenging. During arctic air inversion, the temperature of the air over the mine increases with altitude, and the cold,

    Feb 23, 2014

  • SME
    Experimental and Analytical Study of Vibrating Screen Supports

    By E. Hasanbas

    Vibrating screens and crushers are the workhorses of material sizing. Unfortunately their natural frequency is often in the range of typical supporting structures, thereby making installations prone t

    Feb 23, 2014

  • SME
    Plant Design for Gold to Reduce the Use of Mercury in Artisanal Mining in Segovia Region in the NE of Colombia

    By O. J. R. Baena

    Mining activity in the Segovia region in NE Colombia is the main source of employment in the local economy. This has created major problems of illegality and informality mining associated with a high

    Feb 23, 2014

  • SME
    Reorganisation of Mine Rescue Services Scheme in Central Europe

    Due to the ongoing restructuring of the mining industry in central Europe with a continuous decline of the number of large underground mines and collieries, and a simultaneous decline of staff numbers

    Feb 23, 2014

  • SME
    Ion Exchange Recovery of Rhenium From Copper Leach Solutions Using Weakly Basic Anion Exchange Resins

    By J. Snowberger III

    Rhenium is a valuable and extremely rare chemical element with unique chemical properties. It is extracted commercially as a byproduct from the processing of molybdenite associated with porphyry copp

    Feb 23, 2014

  • SME
    A New Approach To Fine Solids Dewatering

    By C. St. J. Lowe

    Weir Minerals ? Linatex has developed a new approach to the dewatering of fine solids, particularly mine and process plant tailings and wastes. The Weir process, patented in 2009, uses standard proce

    Feb 23, 2014

  • SME
    Estimation of the Fundamental Error Associated to The Sampling of Gold Ores

    By C. Bazin

    The fundamental error associated to the sampling of heterogeneous ore particles is unavoidable and can only be minimized by an adequate selection of the sample mass and/or size reduction of the sample

    Feb 23, 2014

  • SME
    Managing for Risk Associated to Uncertainty on the Grade of Ore Reserves: A Case Study on a Porphyry Copper Orebody in Chile

    By J. A. Botín

    Investment decision for large mining projects imply an enormous financial risk and therefore, require a more complex risk evaluation methodology taking into account all sources of uncertainty from eac

    Feb 23, 2014

  • SME
    Metal Recovery Applications Using a Combination of Ion Exchange and Electrowinning Using Emew® Technology

    By A. Janwong

    Ion exchange technology is becoming more prevalent for metal recovery from low concentration solutions. The products of ion exchange are typically a metal free stream (product stream) and a concentra

    Feb 23, 2014

  • SME
    A Simulation Model for the Optimization and Risk Management of Preproduction Mine Development in a Block Caving Mining Project

    By J. A. Botín

    Mining investment decisions are difficult since decision analysis is often based on scarce information. The sources of uncertainty in large mining investment projects are particularly numerous and are

    Feb 23, 2014

  • SME
    Dilution: Human Error

    By M. Javier

    In business mining, dilution is the result of the operating parameters that occur too often and cause serious consequences to mine performance, questioning TO WHOM BENEFITS DILUTION. Mining persists i

    Feb 23, 2014

  • SME
    Continuous Mining Dust Levels in 20-Foot Cuts With and Without a Scrubber Operating

    Flooded-bed scrubbers on continuous miners have been shown to be an effective respirable dust control technology, traditionally used during the extraction of extended cuts of up to 12.2 m (40 ft). To

    Feb 23, 2014