Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Challenges for High Pressure Grinding in the New Millennium

    By J Knecht, R Klymowsky, E Burchardt

    The wide spread introduction of SAG mills into grinding circuits 20 years ago was the last development which had a major impact on the design and economics of comminution circuits. Single SAG mills we

    Jan 1, 2000

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    An Underground Air Blast - Codelco Chile - Division Salvador

    By M Fishwick Tapia

    This paper was prepared and translated from the final report of the investigation into the Codelco Chile Salvador DivisionÆs air blast which occurred in the Inca-West area. In this section of the bloc

    Jan 1, 2000

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Characterisation of Long-Term Scaling Effects of Ceramic Filter Media Used in the Dewatering of Iron Ore

    By R Salmimies

    Choosing a ceramic capillary action filter is often favoured in processes where low energy consumption is important, such as the dewatering of iron ore. In addition, the performance of the filter medi

    Jul 11, 2011

  • AUSIMM
    Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale Experiments

    By D Maldonado

    BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in

    Jul 11, 2011

  • AUSIMM
    Sampling Techniques for Flash Smelter Shafts

    By Stevenson I, Dickinson W, Taylor R. N

    Despite flash smelting's widespread use little is known about the actual processes taking place in flash furnace shafts and comparatively few reports of sampling campaigns have appeared in the

    Jan 1, 1992

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia

    By Saghafi A, Kelly M, Williams R. J

    A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving

    Jan 1, 1988

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Whittle Programmings's Present and Future Tools for the Strategic Planning of Mines

    The author reviews design evaluation theory and existing optinustion tools and then describes how these have guided recent developments in Whittle Programming's strategic mine design package: F

    Jan 1, 1998

  • AUSIMM
    Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper Mines

    Xstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne

    Jan 1, 2007

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Ground support design of Northparkes E26 Lift 1 North block cave mine

    By Z Li, A Fleming, S Webster, L Snyman

    Northparkes Mines is developing the E26 Lift 1 North block cave mine, which is adjoined to the existing E26 cave. This paper presents the challenges and methods used to design the ground support syste

    Mar 15, 2021

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    Impurity capacities of non-ferrous slags

    By R G. Reddy

    The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The

    Aug 21, 2024

  • AUSIMM
    Secondary means of egress via emergency gig

    By R Austerberry, S Green

    The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A

    Mar 15, 2021