Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving Operations

    By C Vejrazka

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    May 9, 2016

  • AUSIMM
    Results from a Preliminary Investigation of Particulate Emission During the Sintering of Iron Ore

    By J Manuel, A Trudu

    Regulations on the emission of particulates from sinter plant stacks are becoming increasingly stringent and reducing these emissions by improving gas cleaning systems is a significant cost to the sin

    Jan 1, 2002

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000

  • AUSIMM
    Technological Characterisation of West African Iron Ores in Order to Predict their Performance in the Beneficiation Process

    By L Dubron

    This study details a mineralogical and textural characterisation of West African iron ores with an emphasis on their behaviour during mineral processing. By means of both qualitative and quantitative

    Jul 11, 2011

  • AUSIMM
    Wet High Intensity Magnetic Separators Circuit Modelling

    By J D. Grobler

    In the heavy minerals industry wet high intensity magnetic separators (WHIMS) are widely applied for primary magnetic separation of magnetic minerals and non-magnetic minerals. This piece of equipment

    Oct 5, 2011

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • AUSIMM
    Geometallurgy – Bridging the Gap between Mine and Mill: a Case Study of the DeGrussa Geometallurgy Program

    By S Robinson, A Turner, R Dale, C Butler

    "Sandfire Resources NL- (‘Sandfire’) DeGrussa definitive feasibility study (DFS) identified geometallurgy as a major factor in achieving optimum plant performance at the DeGrussa mine. A geometallurgi

    Jun 15, 2016

  • AUSIMM
    Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western Australia

    By F Clark, J T. Carswell

    Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an

    Aug 18, 2014

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017

  • AUSIMM
    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    Reactivity of Australian Coal Chars in Ilmenite Reduction

    By C Li, K McDonald an, T Nicholson, C Brown

    The relative reactivities of chars prepared from different coal samples at temperatures in the range 500 to 1150¦C were determined by measuring the rates of metallisation of a standard ilmenite concen

    Jan 1, 2001

  • AUSIMM
    Geology, Mineralisation and Genesis of the Alkaline Dinkidi Cu-Au Porphyry, North Luzon, Philippines

    By P Joyce, D R. Cooke

    The Dinkidi Cu-Au porphyry deposit is situated in the Caraballo Range of North Luzon, Philippines. Although comparatively small, Dinkidi has unusually high gold grades with drilling by Climax-Arimco M

    Jan 1, 1999

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    Multiple Indicator Kriging - Is it Suited to My Deposit?

    By D Guibal, J Vann, M Harley

    Many sample value distributions are highly skewed and present variograms with high relative nugget effects and/or short-range structures. In consequence, significant deskewing of the histogram and var

    Jan 1, 2000

  • AUSIMM
    "Geometallurgy – Driving Innovation in the Mining Value Chain"

    "Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g

    Jun 15, 2016

  • AUSIMM
    Testing and Sampling Requirements for Input to Spontaneous Combustion Risk Assessment

    By B Beamish

    "All underground coal mines in Australia are required to develop a Spontaneous CombustionManagement Plan (SCMP). The New South Wales Government has developed a guideline (MDG1006) to assist operations

    Jun 1, 2012

  • AUSIMM
    A Review of the Acid Rock Drainage Potential and Hydrological Implications of Selectively-Placed Waste Rock at a Gold Mine in NSW, Australia

    By J Jeffrey, G W. Wilson, L Gilbert, C

    Prior to the commencement of mining, the acid rock drainage (ARD) potential of the waste rock to be produced by an open cut mining operation is assessed by a variety of techniques carried out on drill

    Jan 1, 2003