Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • SME-ICGCM
    Use Of Automated Resistivity System To Locate Potential Subsidence Areas Over Old Mines

    By Richard G. Burdick

    The Bureau of Mines', Denver Research Center has been conducting research for the past few years on the use of resistivity methods to locate abandoned mine workings. As this work has progressed,

    Jan 1, 1982

  • SME-ICGCM
    Computer Modelling And In Situ Instrumentation Techniques: A Quantitative Approach To Scientific Mine Design

    By Bruce H. Gardner

    This paper describes the application procedure of the Stress Control mine design method. This procedure has evolved over the past 20 years of the practice of this Method in trona, potash, salt, and, m

    Jan 1, 1984

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal Mines

    By Rene Rodriguez

    Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ

    Jan 1, 1994

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming

    By Collin L. Stewart

    A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog

    Jan 1, 1995

  • SME-ICGCM
    Underground Application Of Optimization

    By S. J. Jung

    The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min

    Jan 1, 1993

  • SME-ICGCM
    Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel Stopline

    By William D. Gallant

    This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr

    Jan 1, 1990

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    INSTáL CableOx: A New Tensionable & Corrosion Resistant Cable Bolt

    By John C. Stankus

    The success of cable bolts for mine ground control have been well documented in papers presented at this conference too numerous to reference. Cable bolts have proven effective over the years mainly u

    Jan 1, 2000

  • SME-ICGCM
    Rehabilitation of Underground Surge Bunker Following Massive Rib Wall Failure

    By Rob Robinson

    Following a massive rib wall failure along the reclaim belt of the large underground surge bunker at CONSOL?s Bailey Mine, a multifaceted, cleanup and rehabilitation effort was initiated to rapidly st

    Jan 1, 2007

  • SME-ICGCM
    Mining Subsidence Of An Urban Area In Ipswich, Queensland (3581bf43-8b41-4e5e-a797-55082bdbc493)

    By D. J. Maconochie

    This paper describes the investigations and results of monitoring of deformations of houses located within the area of influence of a pillar collapse over the Westfalen No. 3 coal mine near Ipswich, Q

    Jan 1, 1992

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    A Linear Coal Pillar Strength Formula for South African Coal

    By Nielen van der Merwe

    The data base of failed pillar cases as used by Salamon and Munro (1967) in their original analysis to determine the strength of coal pillars empirically, has been updated for this study. It is shown

    Jan 1, 2002

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Remote Control Roof Bolting

    By Cosmo P. Fazio

    Remote control roof bolting is approaching reality with the continued improvement of a number of components and subsystems being developed by The Bendix Corporation under sponsorship of the U.S. Burea

    Jan 1, 1982