Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine

    By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker

    "Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high

    Jan 1, 2018

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining Conditions

    By Ruixiang Gu

    The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie

    Jan 1, 2014

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    Roof Movement and Loading for Top-Coal Caving Longwall Mining in Extremely Inclined Thick Coal

    By Shengliyang Yang, Jinghu Yang, Jiachen Wang, Xiaomeng Li

    "Safe and efficient mining of extremely inclined thick coal seams less than 20m thick is one of the new challenges in China coal industry. In recent years, the extremely inclined thick coal seams have

    Jan 1, 2016

  • SME-ICGCM
    Evaluation of Drill Hole Geometry on Bolted Roof Beam Performance

    By David R. Burkhard

    "Comparative roof beam performance, as measured by delamination within the bolted horizon, was used to evaluate two types of roof bolt drill hole geometries in a development setting. Short encapsulati

    Jan 1, 2016

  • SME-ICGCM
    The Quasi-Protection-Layer Model and Its Mechanisms of Gas Drainage

    By Liu Xiao, Lin Xiaoying, Ma Geng, Tao Yunqi

    "The soft coal in China has several issues, low permeability, high gas content and prone to gas outburst, making it difficult to drill and improve its permeability. Using the rock mass loading test, t

    Jan 1, 2016

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Underground Mining Technology in Chinese Coal Mines

    By Jiachen Wang

    China is the largest coal producing country in the world. Coal is widely distributed in China and thus the mining conditions are complex and diverse. This paper summarizes the important achievements i

    Jan 1, 2014

  • SME-ICGCM
    Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)

    By N. P. Kripakov

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel

    Jan 1, 1992

  • SME-ICGCM
    Application of Thin Spray on Liner (Masterseal) at Longwall T-Junction Sections in German Hard Coal Mines

    By Uwe Wyink, Guenther Thiele, Isabel Gollnick, Klaus Thyrock

    "The application of a thin spray on liner was implemented in longwall T-junction sections in 2009 for the first time. The development of the material and the application is based on a technical cooper

    Jan 1, 2010

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    A Study of the Performance of Glass Fibre Rock Reinforcement Components

    By Jonathan P. Furniss

    The paper describes a range of laboratory tests undertaken on full column resin anchored glass fibre rockbolt systems, to assess all aspects of their performance. Laboratory instrumentation has been d

    Jan 1, 1997

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017