Mineral Resources and Land Use Planning Conflicts in Norway
By K. Nielsen
The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini
Jan 1, 2005
-
Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013
By D. Kumar, R. J. Sweigard, J. Silva
The Forestry Reclamation Approach (FRA) recommends that the upper 1.22 m (4 ft) of spoil material on reclaimed surfaces should be left as uncompacted as possible to facilitate efficient tree root grow
Jan 1, 2013
-
Analysis Of Sudden Floor Heave In Deep Western U.S. Mines - Preprint 09-010
By H. Maleki
As mining continues toward deeper reserves in thick western US coal fields, the control of mining induced-seismicity has become a priority in many operations in Utah, Colorado, and Wyoming. Gradual f
Jan 1, 2009
-
Diamonds and Their Host Rocks in the United States
By W. Dan Hausel
More than 220,000 diamonds have been found in the United States that range from microdiamonds to 40.42 carats in weight (Table 1). Some reports suggest diamonds weighing more than 100 carats have also
Jan 1, 1995
-
Operators Use First-Out Fault Detection To Dramatically Reduce Equipment Downtime
By R. Schulz, K. King
Concentrating Line 6 just went down again. The control room operator checks the graphic display. Only one piece of equipment shows an alarm. Clicking on the ball mill icon, he discovers the culprit wa
Jan 1, 2001
-
New Discoveries at the Red Dog Zinc-Lead Deposit
By S. Jennings
The Red Dog zinc-lead-silver deposit is located in the DeLong Mountains of the western Brooks Range in northwest Alaska. The region is located 145 km(90 miles) north of the village of Kotzebue (Fig.
Jan 1, 1999
-
Portland, Oregon’s Alternative Contract Approach—A Final Summary
By Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007
-
LCA of Magnesium Extraction and Processing Technology Overview
By S. Bargigli, S. Ulgiati, M. Raugei, F. Cherubini
Metallic magnesium is mostly used in lightweight alloys in order to decrease fuel consumption in automotive applications. Several different production processes are currently used worldwide, and the m
Jan 1, 2005
-
Capillary Cover Design For Leach Pad Closure
By K. Burke, G. Zhan, A. Mayer
A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil
Jan 1, 2001
-
Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land (b2bd3f1e-5fbd-441d-ae83-ec597c5ff463)
By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves
Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used
Jan 1, 2001
-
Critical Review Of Numerical Stress Analysis Tools For Deep Coal Longwall Panels Under Strong Strata - Preprint 09-011
By M. K. Larson
Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element
Jan 1, 2009
-
Cemented Rock Fill System Design And Application In Leeville Underground Mine
By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,500 tons of ore per day with an average gold grade of 0.34 opt. The mine has a large horizontal extent of 2,500
Jan 1, 2011
-
Technology News – Atlas Copco Introduces Hydraulic Breaker
The HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn
Jan 1, 2006
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)
By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Performance And Experiential Development Of The Mobile Miner At Mount Isa
By R. J. Boyd
SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc
Jan 1, 1987
-
Design And Development Of A Mobile Mining Machine
By G. L. Dollinger, J. P. Kindsvater, J. A. Gibson
DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo
Jan 1, 1985
-
La Ciénega – A New Gold Mine in Mexico
By F. Grajales Muñoz
The Ciénega project, now under construction by Peñoles group, is located in the mountains of northwest Durango, Mexico. The gold and silver deposits are found in a 4-km (2.5mile) long system of veins.
Jan 1, 1994
-
Fluorspar – trends and changes in production and use
By Lawrence Pelham
Introduction Fluorspar demand or consumption has been taken for granted in recent years, except for those that produce, market, or consume the commodity. Thinking used to be that as the steel and alu
Jan 11, 1986
-
The Technology And Economic Incentives For Recovering Coal From Tailings Impoundments
By A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
A 4.75m Contractor Manufactured EPB Machine
By Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008