Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • NIOSH
    IC 9431 Laboratory Procedures For Hydrometallurgical-Processing And Waste-Management Experiments

    By D. C. Seidel

    This report describes generic procedures and equipment arrangements for conducting laboratory-scale hydrometallurgical and related waste-management experiments. It provides a starting point for person

    Jan 1, 1995

  • NIOSH
    OFR-72-78 Mine Machinery Trainer Development And Fabrication

    By Norman] [Seldle

    This report describes the development of a mine machinery training system from initial conception through a task and skill analysis, a training system analysis, implementation of a prototype system, a

    Jan 1, 1976

  • NIOSH
    RI 3942 Exploration of the Copper-Sulfur Deposit Khayyam and Stumble-on Properties Prince of Wales Island. Alaska

    By Earl L. Fosse

    "Preliminary examination of the Khayyam mine indicated that greater reserves of copper might be found by trenching, sampling, detailed geological and topographical mapping, and diamond drilling. The d

    Sep 1, 1946

  • NIOSH
    IC 8251 Coal Carbonization In The United States, 1900-62 ? Introduction (56b0504a-3bf3-44b2-aef6-99a13575f3c4)

    By Eugene T. Sheridan

    The process of converting coal into coke is known as carbonization. Essentially, carbonization is destructive distillation in which the volatile matter of coal is released when coal is he ted above it

    Jan 1, 1965

  • NIOSH
    IC 8251 Coal Carbonization In The United States, 1900-62 ? Introduction

    By Eugene T. Sheridan

    The process of converting coal into coke is known as carbonization. Essentially, carbonization is destructive distillation in which the volatile matter of coal is released when coal is heated above it

    Jan 1, 1965

  • NIOSH
    RI 4239 Georgia Mica Spots Cherokee, Upson, Lamar, and Monroe Counties

    By William A. Beck

    "INTRODUCTION Mica is found in Georgia from the Fall Line in the central part of the State to the Valley and Ridge Province in the northwest. During the past 3 years, Georgia has been one of the chief

    Apr 1, 1948

  • NIOSH
    OFR-78-79 Development Of A High Energy Impact Breaker For Shaft Sinking - Initial Feasibility And Field Trials In A Rectangular Shaft

    By S. H. E. Phillips

    This report describes the initial feasibility, the development and the field demonstration of a system for shaft sinking employing a high energy mechanical impact rock breaker and a compatible muck di

    Jan 1, 1978

  • NIOSH
    OFR-103(4)-77 U.S.B.M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume II - Drill Hole History

    By L. A. Readdy

    Pilot Hole "X" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. The history of the drilling of Pilot Hole

    Jan 1, 1977

  • NIOSH
    IC 6949 Shaft- And Slope-Bottom Lay-Outs At Coal Mines - Introduction

    By Robert L. Anderson

    A shaft or slope bottom is that portion of a mine that is contiguous to the bottom of the main hoisting shaft or slope. It includes the terminal tracks for loaded-and empty-car storage, locomotive run

    Jan 1, 1937

  • NIOSH
    OFR-54-76 A Conceptual Design And Feasibility Study Of A Variable Wall Mining Machine ? Executive Summary

    The contractor examined L.T. White's Patent No. 3524680 and, finding it in need of engineering refinements, proceeded with a conceptual design of a variable wall mining machine. The contractor th

    Jan 1, 2012

  • NIOSH
    RI 4193 Oil-Well Reconditioning in Southwestern Pennsylvania, West Virginia, and Southeastern Ohio

    By Bruce F. Grant

    "INTRODUCTION The future of oil production in the part of the Appalachian region included in southwestern Pennsylvania; West Virginia, and southeastern Ohio is directly dependent on the maintenance of

    Feb 1, 1948

  • NIOSH
    OFR-94-79 Innovative Machine Design Concepts - Conventional Loader, Auger Cutter, Ranging Head Miner, Rib Clean Up Machine

    By A. Baldwin

    Reports technical progress in designing four machines to be used in mining coal underground, applying innovative concepts at the design stage (instead of add-ons). A study phase was followed by design

    Jan 1, 1976

  • NIOSH
    RI 6218 Mount Gran Coal Deposits, Victoria Land, Antarctica

    By John J. Mulligan

    The Bureau of Mines investigated coal deposits at Mount Gran (latitude 76°59' S, longitude 161°07' E), Victoria Land, Antarctica, during the austral summer of 1959-60 as part of the continui

    Jan 1, 1963

  • NIOSH
    IC 7067 Multiple-Shift Mechanical Mining In Some Bituminous Coal Mines, Progress Report 2 ? Introduction

    By Albert L. Toenges

    This report is the second of a series describing methods and systems of mechanical mining; where operations are conducted on more than one shift. The first report, Information Circular 7014,4/ describ

    Jan 1, 1939

  • NIOSH
    RI 4269 Mining Program, Bureau Of Mines Oil-Shale Project. Rifle, Colo.

    By E. D. Gardner

    The American petroleum industry is supplying the present domestic demand for liquid fuels. Known reserves of petroleum in the ground, however, are limited, and the .cost per barrel of finding new oil

    Jan 1, 1948

  • NIOSH
    OFR-117-85 An Alternate Method To Evaluate Mine Ground System Safety

    By W. L. Cooley

    A significantly different method of evaluating mine ground system safety is investigated. The method measures touch and step potentials around ground beds and grounded equipment resulting from a serie

    Jan 1, 1985

  • NIOSH
    OFR-53-74 Research And Development Contract -Water Through The Drum, 120M Jeffrey Heliminer - Final Report On Contract H0232060, Respirable Dust Control On A Jeffrey 120M HELIMINER By Water Piped Through The Head - I. Introduction

    By Steven C. Goddard

    Since the passage of the Federal Coal Mine Health and Safety Act of 1969, the need for improved duet control methods has become imperative. It has been proposed that one promising dust control techniq

    Jan 1, 1974

  • NIOSH
    IC 6119 Method And Cost Of Mining The Thick Freeport Coal In A Western Pennsylvania Mine

    By J. W. Paul

    This report is one of a series of papers on coal mining methods and costs which are being prepared through the sponsorship of the U. S. Bureau of Mines for the purpose of bringing to the industry a kn

    Jan 1, 1929

  • NIOSH
    IC 8430 Disposal Of Solid Wastes From Coal Mining In Washington, Oregon, And Montana

    By M. R. Geer

    The Bureau of Mines surveyed the solid wastes that have accumulated from coal mining in Washington, Oregon, and Montana. Location, amount, character, and condition were determined, and both economic a

    Jan 1, 1969

  • NIOSH
    OFR-18-76 Economic Feasibility Of Recovering And Utilizing Methane Emitted From Coal ? I. Summary - A. Purpose And Scope

    The U.S. Bureau of Mines has been concerned for many years with the general problems of underground coal mining and the particular problems due to the methane content of the coal. The Bureau and other

    Jan 1, 1975