Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting for Rescue Applications

    By John Norman

    This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.

    Feb 1, 2020

  • ISEE
    Blasting for the Enhanced Western Groundwater Extraction System - Modern Landfill

    By Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron

    In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove

    Jan 1, 2001

  • ISEE
    Expanded Blast Design For Tight Controlled Hard Rock Trenching Adjacent To Twin Burried Live Oil Pipelines

    By A. Ravi Kumar

    A trench is a structure to accommodate fluid carrying pipelines for water, gas, petroleum products etc. Trench serves the purpose to haul the fluids in bulk over long distances safely and economically

    Jan 1, 2008

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • ISEE
    Solving Blasting Safety Hazards with Advanced Technology

    By Ronald W. Roberts

    For years, blasters have experienced near-misses, injuries, and yes, even fatalities as a result of the dangerous nature of our business. Yet, some blasters continue to portray the immortal attitude:

    Jan 1, 1996

  • ISEE
    Social Cost Benefit Analysis of Alumized ANFO

    By Gordon Lovegrove, Jeffrey Leob, Dwayne Tannant

    It has long been known that the combination of aluminum (AL) powder to ammonium nitrate (AN) / fuel oil (FO) can greatly enhance fragmentation or ultimately reduce the number of blast holes in a patte

    Jan 1, 2011

  • ISEE
    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    Hemispherical Charge Comparison to Kingery Bulmash

    By David N/A Doucet, Colter N/A Angell, William N/A Joa, Kyle N/A Wagner, Catherine N/A Johnson, Marty N/A Langenderfer

    The Kingery-Bulmash (K-B) equations are a widely accepted means of predicting air-blast parameters from surface explosive detonations. The parameters predicted from these calculations include incident

    Jan 1, 2019

  • ISEE
    Evaluation Of Suitability Of Permitted Delay Detonators Vis-avis Their Delay Timing For Use In Underground Coal Mines

    By Harsh Kumar Verma

    Blasting off-the-solid is the most commonly used method during development of galleries in Bord and Pillar method of underground coal mining. In this method, only P5 explosives are used with permitted

    Jan 1, 2008

  • ISEE
    Testing Electronic Detonators to Increase SAG Mill Throughput at the Red Dog Mine

    By Norman Paley

    A blasting project was undertaken at the Teck Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by using electronic detonators. The Jul

    Jan 1, 2010

  • ISEE
    Rock Fragmentation Prediction Using Machine Learning

    By Ankit Jha, RICHARD AMOAKO

    In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th

    Feb 1, 2020

  • ISEE
    Integration of Mine Resources in the Optimization of Shot Documentation

    By Kyle Apple

    The following is a case study of how LuckStone Corporation improved their blast monitoring and documentation program. A number of resources already at their disposal have been utilized to improve the

    Jan 1, 2001

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    Tunnel Construction Efficiency and Vibration Control using Electronic Detonators: Focusing on the Contour Holes and Decking Mode

    By Sami Kara, Yunseok Park, Seung-Joong Lee, Namsun Hwang, Michael Laing

    This study conducts a comparative analysis of construction efficiency. In the first part we compared electronic and non-electric initiation systems, focusing on tunnel contour holes. Field blasting op

    Jan 21, 2025

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By Gabe McClain, Thomas Pallua, Joe Schrank, William C. Gates

    Because of restrictions on blasting in urban areas and, more importantly, the proximity of this construction to national historic landmarks, blasting operations were extensively monitored to measure a

    Feb 1, 2020

  • ISEE
    Remotely Piloted Aircrafts (RPAs) as an Everyday Tool for Quarry Planning and Blast Design.

    By Jose Luis Pineda Villarreal

    New technologies emerge every day with practical applications for open pit mining. For every operation, managers need to understand the best way to increase efficiency in drilling, blasting, fragmenta

    Jan 1, 2018

  • ISEE
    An Experimental Method of Determining Explosive Equivalency When Scaled Distance Approaches Zero

    By R. Hazael, R. Alford, R. Critchley

    The ability to compare explosives is fundamental. Numerous methods are used and while simple conversion factors are often used, the use of TNT Equivalency (TNTe) is not a simple subject as explosives

    Jan 1, 2024

  • ISEE
    Initial Selection of Explosive Materials for the Explosives Terrorism Risk Assessment

    By Rachel E. Gooding, George C. Emmett, David R. Bradley

    The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T) is using a probabilistic risk assessment (PRA) approach to evaluate the risks from terrorist

    Jan 1, 2017