    Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall

    By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye

    "Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta

    Jan 1, 2015

  • DFI
    The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the Netherlands

    By Paul M. C. B. M. Cools, Martin Th. van Staveren

    In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i

    Jan 1, 2017

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
    Piled Rafts: Are We Modelling Them Correctly?

    By Jonathan J. Dewsbury

    It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e

    Jan 1, 2010

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information System

    By Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler

    Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e

  • DFI
    A Seepage Control Cutoff in an Extreme Saline Environment

    By Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy

    "Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture

    Jan 1, 2016

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Building Drilled Shafts to Bridge the Mississippi

    By Brian Koch

    Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled

    Jan 1, 2019

  • DFI
    Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.

    By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney

    The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Deep Mixing Technology in Deep Excavation in Soft Soil Area of Shanghai

    By Jie-qun Zhai, Jian Jia, Ke Yang, Xiao-lin Xie, Yu Zhang

    "With cities’ development, underground space exploitation presents a need for bigger and deeper constructions now. Technical problems founded during the construction of deep foundation pit support bec

    Jan 1, 2015

  • DFI
    A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls

    By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis

    "The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.

    Jan 1, 2016

  • DFI
    An Enhanced P&H Tensionless Pier Foundation for Onshore Wind Turbines

    By Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim

    The demand for renewable energy is growing as the conventional energy resources are becoming more limited and we are more conscious about the negative impact of conventional energy sources on the envi

    Sep 8, 2021

  • DFI
    Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, Darwin

    By J. Racinais, P. Vincent

    "In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m

    Jan 1, 1900

  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • DFI
    Microstructure of Bio-Cemented Coarse Sand

    By Abdelmalek Bouazza, Aamir Mahawish, Will P. Gates

    Bio-grouting by means of microbial induced calcite (calcium carbonate) precipitation (MICP) to improve mechanical properties of granular soils has gained much attention in recent years. The biogroutin

    Jan 1, 1900

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis