Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Special Aspects of Constructions with Deep Mixing Systems for Infrastructures
By Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip
"A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc
Jan 1, 2015
-
Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations
By Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Analysis and Case Study for Minimizing Differential Settlements in Piled Raft Foundations
By Yu Chuang, Zai Jinmin, Liu Songyu
"The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti
Jan 1, 2005
-
Best Practices for Soil Mixing Near Sensitive Structures
By Joseph A. Mann
"Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom
Jan 1, 2015
-
Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway Upgrade
By Henry Zhang
This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re
Nov 1, 2022
-
St. Louis Service Base Floating Wharf Mooring System Replacement
By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
By Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
San Francisco International Airport Air Traffic Control Tower Pile Foundations
By Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz
"The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to
Jan 1, 2017
-
Undergraduate Learning Commons
By William M. Tanner, Daniel C. Brahana
"A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,
Jan 1, 2015
-
From Linear To Circular Economy; Using Hollow Piles To Reduce Embodied Carbon And Promote Pile Reuse
By Andrew McNamara, Stuart Norman, Matthew Dearing, Michael Pelken, Asha Panchal
The deep foundations industry has largely remained unchanged since in the advent of CFA piling in the 1960s. Piles have consequently been designed and constructed following the traditional codes and s
May 1, 2022
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico
By Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”
By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area
By Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile Building
By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Performance of Open-Ended Pipe Piles in Cretaceous Soils of Baltimore
By Sanjeev Malhotra
"This paper presents the results of a pile installation monitoring and performance assessment program for pile foundations supporting 14 piers and 2 abutments of the 1700-ft long bridge crossing over
Jan 1, 2005
-
An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, Singapore
By Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena
One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil
May 1, 2022
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction
By Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Repairs Of Diaphragm Walls, Lessons Learned
By Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method
By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of Piles
By Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008